Project details
| Official title | Vijapur Reinforcement Steel Pipeline Connectivity in Sabarkantha District. |
|---|---|
| Status | Forest land use approved |
| Status since | 18 Apr 2026 |
| Application filed | 2 May 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Pipelines |
| Applicant | Sabarmati Gas LTD |
| Land area | 1.8 acres (0.7 ha) |
| Forest land | 1.8 acres (0.7 ha) |
| Project cost | ₹50 crore |
| Village / locality | Savgadh |
| Taluk / tehsil | Himatnagar |
| District | Sabar Kantha |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14383 |
In context
36 applications in Sabar Kantha since January 2022 are in the same category (Pipelines): 8 approved, 14 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 1.8 acres, this one is smaller than 52% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Savgadh, Himatnagar, Sabar Kantha, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Recall Alloys — cleared for impact study, 1.1 km away
- Ujaval Alloys — cleared for impact study, 1.2 km away
- Shree laxmi Metal — cleared for impact study, 1.3 km away
- Mining project by M/s. Ken Enterprise C/o. J. D. Patel Re-appraisal… — not approved, 3.6 km away
- Dedhrota Sand/Gravel Mine, Survey No-267 Paiki ( Area-3.00Ha) of M/S Sahyog… — environmental approval granted, 4.3 km away
- Shri Zala Pratipalsinh Vijaysinh — lapsed, 4.3 km away
- Shri Zala Pratipalsinh Vijaysinh — withdrawn, 4.3 km away
- Ilol Other Building stone Mine of Shri Saiyad Jahirhusen Saiyedali — environmental approval granted, 4.5 km away
More from Sabarmati Gas LTD in Sabar Kantha
- Re-Diversion of Laying of 12" Dia Steel Gas Pipeline from Idar to Bhiloda… — more information requested
- Laying of 4" Dia Steel Pipeline For G.S. Energy CNG Station Pipeline… — more information requested
- 4" Dia Steel Pipeline For Galaxy Petroleum CNG Gas Station - Sabarkantha… — more information requested
- Piludra-Kathwad-Gadhoda Steel Pipeline Connectivity, Himatnagar — forest land use approved
- Laying of proposed SGL Existing Pipeline at Gopinath Complex, Prantij to Vinod… — forest land use approved
- Laying of 12" dia. Steel underground Gas Pipeline from Gadhoda Tap Off Station… — forest land use approved
13 Sabarmati Gas projects in Sabar Kantha
All 76 Sabarmati Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.