Quick answers
What is this project?
Erection of Telephone Tower installation through Summit Digitel Infrastructure Limited for this uncovered (1) 22. Lodrani to X-Block Road-ENB-0041 (2) 23. Lodrani to X-Block Road-ENB-0042 (3) 24. Lodrani to X-Block Road-ENB-0043 (4) 44. SH-45-ENB-0006 Forest Divison Kutch East, Diversion Hec. 0.25 Sq mtr. 2500 Dist. Kutch (Sanctuary Area) is a proposed road project in Na, Bhachau, Kachchh, Gujarat. The site covers 0.6 acres.
Who is building it?
The applicant is Summit Digitel Infrastructure Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Na, Bhachau, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹1 crore and a site of 0.6 acres.
When was it filed?
The application was filed on 29 May 2024.
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 29 May 2024 |
| Application filed | 29 May 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Summit Digitel Infrastructure Limited |
| Land area | 2,500 m² |
| Project cost | ₹1 crore |
| Village / locality | Na |
| Taluk / tehsil | Bhachau |
| District | Kachchh |
| State | Gujarat |
| Location from | Site area on record |
| Our reference | WID-GJ-14546 |
In context
76 applications in Kachchh since January 2022 are in the same category (Roads & highways): 23 approved, 32 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.6 acres, this one is smaller than 52% of them.
Where it is
Na, Bhachau, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Kutch East Forest Division,… — application filed, 10.4 km away
- Laying of Under Ground Water Pipeline for the Irrigation Purpose — under wildlife review, 12.9 km away
- Shri Nagjibhai Govabhai Rabari — environmental approval granted, 16.6 km away
- Shri Gelabhai Bhachubhai Rabari — under environmental review, 17.9 km away
- Shri Gelabhai Bhachubhai Rabari — cleared for impact study, 17.9 km away
- Laying of Underground Water Pipeline From Kachchh Branch Canal at Ch.105 to… — more information requested, 22 km away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Forest Division Kutch East ,… — application filed, 24.7 km away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Forest Division Kutch East,… — application filed, 26.1 km away
More from Summit Digitel Infrastructure Limited in Kachchh
All 11 Summit Digitel Infrastructure projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.