| Official title | Proposed Greenfield Project for Set up of Solar PV Plant of 75 MW at 179.30 Ha land at village Kalamsar at Survey No. 932/P, Kalamsar Village, Tal: Khambhat, Dist.: Anand, Gujarat by Gujarat State Electricity Corporation Limited |
|---|---|
| Status | Coastal clearance granted |
| Status since | 12 Aug 2024 |
| Application filed | 7 Dec 2023 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Gujarat State Electricity Corporation Limited |
| Use | Other |
| Land area | 443.1 acres (179.3 ha) |
| Plot area | 17,93,000 m² (1,92,99,673 sq ft) |
| Project cost | ₹284.9 crore |
| Village / locality | Kalamsar |
| Taluk / tehsil | Khambhat |
| District | Anand |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14775 |
In context
5 applications in Anand since January 2022 are in the same category (Buildings & townships): 3 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kalamsar, Khambhat, Anand, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- CRZ Clearance of Post facto Project 2 x 75 MW; Phase-I & II Solar PV projects… — lapsed, 1.8 km away
- Project by M/s. Rohan Dye & Intermediates Ltd. Unit-1 — initial checks, 5.2 km away
- Rohan Dyes & Intermediates LTD., Unit – 1 — initial checks, 5.2 km away
- Diversion of 0.6216 ha. Protected Forest land for the grant permission for… — lapsed, 8.8 km away
- 90 mm & 63 mm Dia Gas Pipeline connectivity From Khambhat - Dhuvaran Road to… — forest land use approved, 10.1 km away
- Diversion of 1.3718 Ha. Protected Forest land for Bharti Airtel Limited… — forest land use approved, 10.4 km away
- Development and Production by Drilling of Six (06) New Wells as well as… — environmental approval granted, 10.5 km away
- Development and Production by Drilling of Six (06) New Wells as well as… — returned to applicant, 10.5 km away
More from Gujarat State Electricity Corporation Limited in Anand
All 25 Gujarat State Electricity Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.