Quick answers
What is this project?
Desalination Plant, Laying of Sea Water Intake & Outfall pipeline with diffuser system, Ammonia Transport Pipelines & Power Transmission Line for development of Green Ammonia production facility at Kandla, Kachchh, Gujarat is a lapsed power project in Kandla (Ct), Gandhidham, Kachchh, Gujarat. The site covers 499.9 acres.
Who is building it?
The applicant is L&T Energy Green Tech Limited.
Has it been approved?
No. The application was lapsed on 11 Dec 2025, so it is no longer under consideration.
Where is it?
In Kandla (Ct), Gandhidham, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹1,500 crore and a site of 499.9 acres.
When was it filed?
The application was filed on 5 Nov 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 11 Dec 2025 |
| Application filed | 5 Nov 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Power |
| Applicant | L&T Energy Green Tech Limited |
| Land area | 499.9 acres (202.3 ha) |
| Project cost | ₹1,500 crore |
| Village / locality | Kandla (Ct) |
| Taluk / tehsil | Gandhidham |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14874 |
In context
75 applications in Kachchh since January 2022 are in the same category (Power): 30 approved, 30 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 499.9 acres, this one is larger than 85% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kandla (Ct), Gandhidham, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gandhidham Te to Bhachau Bsnl Te Bsnl Ofc Route — lapsed, 4.7 km away
- M/s. Varrsana Ispat Limited plan to proposed Expansion for Integrated Iron &… — more information requested, 4.8 km away
- M/s. Varrsana Ispat Limited plan to proposed Expansion for Integrated Iron &… — cleared for impact study, 4.8 km away
- Expansion in sponge iron and metallurgical industry (under provisions of para… — returned to applicant, 4.8 km away
- Regularization and inclusion of existing Rolling project/products in… — environmental approval granted, 4.8 km away
- Regularization and inclusion of existing Rolling project/products in… — cleared for impact study, 4.8 km away
- Proposed Expansion (less than 20 % of earlier approved production capacity) in… — environmental approval granted, 4.9 km away
- Proposed Expansion (less than 40 % of earlier approved production capacity) in… — returned to applicant, 4.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.