Quick answers
What is this project?
Development and Construction Dream City Depot including Metro Bhavan, Operation Control Center (OCC) and associated Electrical and Mechanical (E & M) works under corridor C1, Sarthana to Dream City, in connection with Surat Metro Rail project Phase- 1, Package DC-01 of Surat Metro Rail Project is an approved railway project in Jiav, Majura, Surat, Gujarat. The site covers 68.1 acres.
Who is building it?
The applicant is Gujarat Metro Rail Corporation (Gmrc) Limited.
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 21 Mar 2025), as of 27 Nov 2026.
Where is it?
In Jiav, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹464.5 crore and a site of 68.1 acres.
When was it filed?
The application was filed on 15 Jan 2025.
Project details
| Status | Coastal clearance granted |
|---|---|
| Status since | 21 Mar 2025 |
| Application filed | 15 Jan 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Railways & metro |
| Applicant | Gujarat Metro Rail Corporation (Gmrc) Limited |
| Land area | 68.1 acres (27.5 ha) |
| Project cost | ₹464.5 crore |
| Village / locality | Jiav |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14904 |
In context
7 applications in Surat since January 2022 are in the same category (Railways & metro): 4 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected.
91 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jiav, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Submission of Forest Land Proposal for Diversion of Protected Forest Land of… — more information requested, 1 km away
- DREAM City Metro Station including Ramp for Entry / Exit and Elevated Viaduct… — coastal clearance granted, 1.2 km away
- Submission of Forest Land Proposal for Diversion of Protected Forest Land of… — more information requested, 1.3 km away
- Diamond Research and Mercantile City (DREAM City) — lapsed, 1.7 km away
- Shrungal Icon — initial checks, 2.4 km away
- Vishvam Heights — environmental approval granted, 2.5 km away
- Rosewood — environmental approval granted, 2.5 km away
- Two Six Lane Vups Including Re Wall, Service Road and Drain by NHAI — forest land use approved, 2.6 km away
More from Gujarat Metro Rail Corporation (Gmrc) Limited in Surat
- DREAM City Metro Station including Ramp for Entry / Exit and Elevated Viaduct… — coastal clearance granted
- Proposed Metro Bridge Across River Tapi Adjoining Badrinarayn Temple station… — coastal clearance granted
- Surat Metro Rail Project — more information requested
4 Gujarat Metro Rail Corporation (Gmrc) projects in Surat
All 6 Gujarat Metro Rail Corporation (Gmrc) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.