Quick answers
What is this project?
Crz Clearance for Deep Sea Disposal of 650 Mld Treated Effluent From Seven Cetps Located Within the Surat Region Through Conveyance Pipelines to the Landfall Point Located Near Danti Village is an approved building project in Magob, Jalalpore, Navsari, Gujarat. The site covers 6,193.6 acres.
Who is building it?
The applicant is Gujarat Industrial Development Corporation.
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 11 Nov 2026), as of 27 Nov 2026.
Where is it?
In Magob, Jalalpore, Navsari, Gujarat.
How big is it?
It has a stated cost of ₹5,473.1 crore and a site of 6,193.6 acres.
When was it filed?
The application was filed on 27 Aug 2026.
Project details
| Official title | Crz Clearance for Deep Sea Disposal of 650 Mld Treated Effluent From Seven Cetps Located Within the Surat Region Through Conveyance Pipelines to the Landfall Point Located Near Danti Village in Navsari District and Further Extending to the Outfall Point Located in the Offshore Region of Ubharat and Vansi Region Into the Gulf of Khambhat in the Arabian Sea. |
|---|---|
| Status | Coastal clearance granted |
| Status since | 11 Nov 2026 |
| Application filed | 27 Aug 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Gujarat Industrial Development Corporation |
| Use | Other |
| Land area | 6,193.6 acres (2,506.5 ha) |
| Built-up area | 8,04,229 m² (86,56,641 sq ft) |
| Project cost | ₹5,473.1 crore |
| Village / locality | Magob |
| Taluk / tehsil | Jalalpore |
| District | Navsari |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14947 |
In context
14 applications in Navsari since January 2022 are in the same category (Buildings & townships): 5 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. At 6,193.6 acres, this one is larger than 91% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Magob, Jalalpore, Navsari, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Hf Radar Station on the Backside of Wasi Borsi Lighthouse Towards Sea Side — in-principle approval, conditions pending, 4.6 km away
- Protection Wall against Sea Erosion of Coast — lapsed, 5.1 km away
- Diversion of 14.8925 ha of Unclassed Forest Land (notified under Section 4 of… — under forest review, 5.2 km away
- Up-gradation of Fish Landing Centre at Vansi Borsi, District Navsari, Gujarat — coastal clearance granted, 5.3 km away
- Bridge across River Purna (Creek) connecting Dandi-Samapor-Gosiya-Machhiwad — coastal clearance granted, 6.9 km away
- Integrated Textile and Apparel Park at Block No: 87 & 247, Village: Vansi,… — environmental approval granted, 7.7 km away
- Integrated Textile and Apparel Park at Block No: 87 & 247, Village: Vansi,… — cleared for impact study, 7.7 km away
- Integrated Textile and Apparel Park at Block No: 87 & 247, Village: Vansi,… — more information requested, 7.7 km away
More from Gujarat Industrial Development Corporation in Navsari
- Integrated Textile and Apparel Park at Block No: 87 & 247, Village: Vansi,… — environmental approval granted
- Integrated Textile and Apparel Park at Block No: 87 & 247, Village: Vansi,… — cleared for impact study
- Integrated Textile and Apparel Park at Block No: 87 & 247, Village: Vansi,… — more information requested
4 Gujarat Industrial Development Corporation projects in Navsari
All 21 Gujarat Industrial Development Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.