Quick answers
What is Devasya Aviraa?
Devasya Aviraa is a proposed building project in Khoraj, Gandhinagar, Gujarat. The site covers 1.9 acres.
Who is building it?
The applicant is Dwarkesh Infra.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Khoraj, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹240.1 crore and a site of 1.9 acres.
When was it filed?
The application was filed on 29 Oct 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 16 Nov 2026 |
| Application filed | 29 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Dwarkesh Infra |
| Land area | 1.9 acres (0.8 ha) |
| Project cost | ₹240.1 crore |
| Village / locality | Khoraj |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-15007 |
What the filings say
What is planned
Dwarkesh Infra proposes the construction of a mixed-use residential and commercial project named Devasya Aviraa in Khoraj, Gandhinagar. The applicant's project report describes a development consisting of four blocks (A, B, C, and D) with a total built-up area of 88,295.88 square metres.
The project is planned to include 320 residential units and 16 commercial units. The residential buildings are designed to reach a height of 22 floors above ground level. The project will also include three basement levels for parking and services.
| Item | Detail |
|---|---|
| Total Plot Area | 0.77 hectares (1.90 acres) |
| Total Built-up Area | 88,295.88 square metres |
| Total FSI Area | 45,524.30 square metres |
| Residential Units | 320 |
| Commercial Units | 16 |
| Tallest Building | 22 Floors |
| Basements | 3 Levels |
| Total Parking Area | 20,824.36 square metres |
Layout and design
The layout plan shows four distinct blocks arranged around a central hollow plinth parking area. The ground floor is designated for hollow plinth parking and amenities. The first floor is planned for society common use, while residential units begin from the second floor upwards. Refuge areas are designated on the 4th, 6th, 11th, 16th, and 20th floors.
Vertical circulation will be managed by five lifts per block, including dedicated fire lifts. The design incorporates a 2.30-metre wide walkway around the building blocks. The project site is bordered by 24-metre wide Town Planning Scheme (TPS) roads on two sides and an 18-metre wide TPS road on a third side.
Land and surroundings
The project is situated on amalgamated Final Plot numbers 19 and 21 of TPS No. 62 (Khoraj). The land is currently open and was not used for agriculture. The site is located within the limits of the Gandhinagar Municipal Corporation (GMC).
Nearby infrastructure includes the Jaspur cross road railway station approximately 755 metres away and Ahmedabad Airport approximately 10.5 km from the site. The surrounding area is described as a developing urban locality with schools, hospitals, and community facilities in the vicinity.
Water, power and access
During the construction phase, water requirement is estimated at 30 kilolitres per day (KLD). For the operation phase, the total water requirement is projected at 322 KLD on the first day, reducing to a fresh water demand of 223 KLD from the second day onwards as recycling systems begin operation. Water will be sourced from the GMC.
Power requirement is estimated at 30 kW during construction and 3.0 MW during the operation phase, to be sourced from Uttar Gujarat Vij Company Limited (UGVCL). A diesel generator (DG) set will be provided for emergency backup. Access to the site is provided via the existing TPS road network.
Environmental safeguards
The applicant proposes a Sewage Treatment Plant (STP) with a capacity of 350 KLD. Approximately 109 KLD of treated wastewater will be reused for flushing and gardening, with the remaining 187 KLD discharged into the GMC drainage network.
For solid waste, the project will generate an estimated 1,004 kg per day of domestic waste. This will be segregated into dry waste (552 kg) and wet waste (452 kg). Wet waste is planned to be processed in an on-site Organic Waste Converter to produce manure for the greenbelt.
A greenbelt area of 1,116.4 square metres (approximately 14.6% of the plot area) is planned, consisting of 347 square metres of tree cover and 769.40 square metres of lawn. Rainwater harvesting will be implemented through two percolation wells. To conserve energy, the applicant plans to install a 49 kW solar rooftop system and use LED lighting in common areas.
Devasya Aviraa site plan and layout
3 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.9 acres, this one is larger than 71% of them.
125 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khoraj, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kadamb lavish — environmental approval granted, 400 m away
- Shivon Samshti — environmental approval granted, 400 m away
- Shivon Samshti — environmental approval granted, 400 m away
- Shilp Celestial — environmental approval granted, 400 m away
- Riviera Crown — environmental approval granted, 550 m away
- Sanctum — environmental approval granted, 550 m away
- The Regal — environmental approval granted, 600 m away
- The Regal — environmental approval granted, 600 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.