What is Developing? Open the mapMap

LapsedMining · Sirmaur, Himachal Pradesh

Chowki Mrigwal" Lime Stone Mine, Proposed Limestone Production Expansion from 20000 TPA to 85937.5 TPA, M/s Giri Lime & chemicals Prop. Shri Arun Grover

Chowki Mrigwal" Lime Stone Mine, Proposed Limestone Production Expansion from 20000 TPA to 85937.5 TPA, M/s Giri Lime & chemicals Prop. Shri Arun Grover is a lapsed mining project in Baila Gujon (213), Kamrau, Sirmaur, Himachal Pradesh. The site covers 9.6 acres. Its stated project cost is ₹2 crore. As of 27 Nov 2026, its status is “Lapsed” (since 4 May 2025).

See it on the live map All projects in Sirmaur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since4 May 2025
Application filed8 Aug 2024
Approval soughtEnvironmental approval
Application typeExpansion
SectorMining
ApplicantArun Grover
Land area9.6 acres (3.9 ha)
Project cost₹2 crore
Village / localityBaila Gujon (213)
Taluk / tehsilKamrau
DistrictSirmaur
StateHimachal Pradesh
Location fromSite boundary on record
Our referenceWID-HP-00057

In context

97 applications in Sirmaur since January 2022 are in the same category (Mining): 49 approved, 18 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 9.6 acres, this one is larger than 55% of them.

No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.

Where it is

Baila Gujon (213), Kamrau, Sirmaur, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.