What is Developing? Open the mapMap

LapsedMining · Bilaspur, Himachal Pradesh

Revalidation of EC under MoEF&CC Notification S.O 1530(E) dated 06th April, 2018 for Limestone Mine (Area: 231.25 ha.) with Production Capacity of 4.5 Million TPA (limestone, shale & Quartzite) and sub-grade mineral stacking 2,50,000 CuM per annum (0.51 MTPA) (Maximum) having two nos. Crushers, capacity being 1000 TPH & 400 TPH respectively at Villages Nalag, Bhaterh Uprali, Barmana, Jamthal, Dhawan Kothi, Baloh & Panjgain, Tehsil Sadar, District Bilaspur, State: Himachal Pradesh

Revalidation of EC under MoEF&CC Notification S.O 1530(E) dated 06th April, 2018 for Limestone Mine (Area: 231.25 ha.) with Production Capacity of 4.5 Million TPA (limestone, shale & Quartzite) and sub-grade mineral stacking 2,50,000 CuM per annum (0.51 MTPA) (Maximum) having two nos. Crushers, capacity being 1000 TPH & 400 TPH respectively at Villages Nalag, Bhaterh Uprali, Barmana, Jamthal, Dhawan Kothi, Baloh & Panjgain, Tehsil Sadar, District Bilaspur, State: Himachal Pradesh is a lapsed mining project in Barmana (128), Bilaspur Sadar, Bilaspur, Himachal Pradesh. The site covers 571.4 acres. Its stated project cost is ₹83.2 crore. As of 27 Nov 2026, its status is “Lapsed” (since 3 Jun 2026).

See it on the live map All projects in Bilaspur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Revalidation of EC under MoEF&CC Notification S.O 1530(E) dated 06th April, 2018 for Limestone Mine (Area: 231.25 ha.) with Production Capacity of 4.5 Million TPA (limestone, shale & Quartzite) and sub-grade mineral stacking 2,50,000 CuM per annum (0.51 MTPA) (Maximum) having two nos. Crushers, capacity being 1000 TPH & 400 TPH respectively at Villages Nalag, Bhaterh Uprali, Barmana, Jamthal, Dhawan Kothi, Baloh & Panjgain, Tehsil Sadar, District Bilaspur, State: Himachal Pradesh is a lapsed mining project in Barmana (128), Bilaspur Sadar, Bilaspur, Himachal Pradesh. The site covers 571.4 acres.

Who is building it?

The applicant is M/S Acc Limited Gagal Cement Works.

Has it been approved?

No. The application was lapsed on 3 Jun 2026, so it is no longer under consideration.

Where is it?

In Barmana (128), Bilaspur Sadar, Bilaspur, Himachal Pradesh.

How big is it?

It has a stated cost of ₹83.2 crore and a site of 571.4 acres.

When was it filed?

The application was filed on 11 Dec 2023.

Project details

StatusLapsed
Status since3 Jun 2026
Application filed11 Dec 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantM/S Acc Limited Gagal Cement Works
Land area571.4 acres (231.3 ha)
Project cost₹83.2 crore
Village / localityBarmana (128)
Taluk / tehsilBilaspur Sadar
DistrictBilaspur
StateHimachal Pradesh
Location fromSite boundary on record
Our referenceWID-HP-00098

In context

25 applications in Bilaspur since January 2022 are in the same category (Mining): 21 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 571.4 acres, this one is larger than 96% of them.

No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.

Where it is

Barmana (128), Bilaspur Sadar, Bilaspur, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from M/S Acc Limited Gagal Cement Works in Bilaspur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.