Quick answers
What is Formaldehyde Manufacturing Unit (100KLD)?
Formaldehyde Manufacturing Unit (100KLD) is a proposed industrial project in Chanaur (94), Dadasiba, Kangra, Himachal Pradesh. The site covers 1 acre.
Who is building it?
The applicant is Feel Organic Products.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 4 Mar 2023), as of 27 Nov 2026.
Where is it?
In Chanaur (94), Dadasiba, Kangra, Himachal Pradesh.
How big is it?
It has a stated cost of ₹10.1 crore and a site of 1 acre.
When was it filed?
The application was filed on 4 Mar 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 4 Mar 2023 |
| Application filed | 4 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Feel Organic Products |
| Land area | 4,000 m² |
| Project cost | ₹10.1 crore |
| Village / locality | Chanaur (94) |
| Taluk / tehsil | Dadasiba |
| District | Kangra |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00133 |
In context
21 applications in Kangra since January 2022 are in the same category (Industry): 10 approved, 8 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1 acre, this one is smaller than 86% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chanaur (94), Dadasiba, Kangra, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Common Biomedical Waste Treatment Facility (CBWTF)" — lapsed, 50 m away
- Extraction of minor minerals (Sand, Stone & Bajri) by Sh. Dharambir Singh &… — environmental approval granted, 2.3 km away
- Extraction of Sand, Stone and Bajri over an area measuring 16-20-54 Ha (Govt.… — environmental approval granted, 3 km away
- Proposed Campus of Central University of Himachal Pradesh by Central… — withdrawn, 9 km away
- Mining project by M/s V.B. Stone Crusher, Prop: Sh. Bhavesh Jaswal — environmental approval granted, 9 km away
- Rajiv Gandhi Day Boarding School at Dehra — lapsed, 9.4 km away
- Link Road from Durgain Lakharda Kahanpur Beri via Chakoli including Bridge… — lapsed, 13.6 km away
- Link Road From NH-88 to Village Bhangwar Km 0/000 to 1/020 — lapsed, 14.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.