Quick answers
What is this project?
Extraction of Sand Stone & Bajri by Sh. Ravi Verma Prop; M/s Shree Ram Stone Crusher is a proposed mining project in Maira Batrah (64), Nurpur, Kangra, Himachal Pradesh. The site covers 5.2 acres.
Who is building it?
The applicant is Ravi Verma.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 31 Jul 2023), as of 27 Nov 2026.
Where is it?
In Maira Batrah (64), Nurpur, Kangra, Himachal Pradesh.
How big is it?
It has a stated cost of ₹25 lakh and a site of 5.2 acres.
When was it filed?
The application was filed on 31 Jul 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Extraction of Sand Stone & Bajri by Sh. Ravi Verma Prop; M/s Shree Ram Stone Crusher.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 31 Jul 2023 |
| Application filed | 31 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ravi Verma |
| Land area | 5.2 acres (2.1 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Maira Batrah (64) |
| Taluk / tehsil | Nurpur |
| District | Kangra |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00146 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Nov 2024 | Environmental approval granted | 5.2 acres | ₹25 lakh |
| Early planning filed 31 Jul 2023 (this page) | Cleared for impact study | 5.2 acres | ₹25 lakh |
In context
131 applications in Kangra since January 2022 are in the same category (Mining): 91 approved, 25 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 5.2 acres, this one is smaller than 79% of them.
7 other mining leases have applied within 500 m of this site; together with this one they cover 105.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.
Where it is
Maira Batrah (64), Nurpur, Kangra, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Extraction of Sand Stone & Bajri by Sh. Ravi Verma Prop; M/s Shree Ram Stone… — environmental approval granted, 0 m away
- Extension in the validity of Environmental Clearance for Extraction/collection… — environmental approval granted, 150 m away
- Extraction of sand, stone & bajri by Sh. Lakhwinder Singh, Prop. M/s… — environmental approval granted, 200 m away
- Extraction of Sand, Stone and Bajri from Khasra no. 744/1 over an area… — environmental approval granted, 200 m away
- Extraction of Sand, Stone and Bajri from Khasra no. 744/1 over an area… — cleared for impact study, 200 m away
- Extraction of sand, stone & bajri by Sh. Lakhwinder Singh, Prop. M/s… — cleared for impact study, 200 m away
- Application for extension of EC validity proposal for extraction Sand, Stone… — environmental approval granted, 450 m away
- Collection/ Extraction of Sand, Stone & Bajri by Sh. Vipul Sehgal, through… — environmental approval granted, 450 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.