What is Developing? Open the mapMap

Cleared for impact studyMining · Kangra, Himachal Pradesh

Extraction of Sand, Stone & Bajri from Khasra No. 1558/1 (Govt. Land & River Bed), measuring an area 15-03-30 Hectares falling in Mauza & Mohal Dhanyara & Alampur, Tehsil Dheera, District Kangra, H.P, Proposed by (GPA) Sh. Rohit Jamwal, S/o Sh. Om Prakash Jamwal & Sh. Rahul Pathania S/o Ranjeet Singh, Production Capacity-181350 TPA

Extraction of Sand, Stone & Bajri from Khasra No. 1558/1 (Govt. Land & River Bed), measuring an area 15-03-30 Hectares falling in Mauza & Mohal Dhanyara & Alampur, Tehsil Dheera, District Kangra, H.P, Proposed by (GPA) Sh. Rohit Jamwal, S/o Sh. Om Prakash Jamwal & Sh. Rahul Pathania S/o Ranjeet Singh, Production Capacity-181350 TPA is a proposed mining project in Dadu (452), Jaisinghpur, Kangra, Himachal Pradesh. The site covers 37.1 acres. Its stated project cost is ₹50 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 6 Mar 2025).

See it on the live map All projects in Kangra

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Extraction of Sand, Stone & Bajri from Khasra No. 1558/1 (Govt. Land & River Bed), measuring an area 15-03-30 Hectares falling in Mauza & Mohal Dhanyara & Alampur, Tehsil Dheera, District Kangra, H.P, Proposed by (GPA) Sh. Rohit Jamwal, S/o Sh. Om Prakash Jamwal & Sh. Rahul Pathania S/o Ranjeet Singh, Production Capacity-181350 TPA is a proposed mining project in Dadu (452), Jaisinghpur, Kangra, Himachal Pradesh. The site covers 37.1 acres.

Who is building it?

The applicant is Shiv Shakti Precast Industries.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 6 Mar 2025), as of 27 Nov 2026.

Where is it?

In Dadu (452), Jaisinghpur, Kangra, Himachal Pradesh.

How big is it?

It has a stated cost of ₹50 lakh and a site of 37.1 acres.

When was it filed?

The application was filed on 27 Nov 2024.

Project details

StatusCleared for impact study
Status since6 Mar 2025
Application filed27 Nov 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantShiv Shakti Precast Industries
Land area37.1 acres (15 ha)
Project cost₹50 lakh
Village / localityDadu (452)
Taluk / tehsilJaisinghpur
DistrictKangra
StateHimachal Pradesh
Location fromSite boundary on record
Our referenceWID-HP-00252

In context

131 applications in Kangra since January 2022 are in the same category (Mining): 91 approved, 25 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 37.1 acres, this one is larger than 93% of them.

No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.

Where it is

Dadu (452), Jaisinghpur, Kangra, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Shiv Shakti Precast Industries in Kangra

All 3 Shiv Shakti Precast projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.