Quick answers
What is this project?
Extraction of Sand, Stone & Bajri from Khasra No. 1558/1 (Govt. Land & River Bed), measuring an area 15-03-30 Hectares falling in Mauza & Mohal Dhanyara & Alampur, Tehsil Dheera, District Kangra, H.P, Proposed by (GPA) Sh. Rohit Jamwal, S/o Sh. Om Prakash Jamwal & Sh. Rahul Pathania S/o Ranjeet Singh, Production Capacity-181350 TPA is a proposed mining project in Dadu (452), Jaisinghpur, Kangra, Himachal Pradesh. The site covers 37.1 acres.
Who is building it?
The applicant is Shiv Shakti Precast Industries.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 6 Mar 2025), as of 27 Nov 2026.
Where is it?
In Dadu (452), Jaisinghpur, Kangra, Himachal Pradesh.
How big is it?
It has a stated cost of ₹50 lakh and a site of 37.1 acres.
When was it filed?
The application was filed on 27 Nov 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 6 Mar 2025 |
| Application filed | 27 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shiv Shakti Precast Industries |
| Land area | 37.1 acres (15 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Dadu (452) |
| Taluk / tehsil | Jaisinghpur |
| District | Kangra |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00252 |
In context
131 applications in Kangra since January 2022 are in the same category (Mining): 91 approved, 25 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 37.1 acres, this one is larger than 93% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Dadu (452), Jaisinghpur, Kangra, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Extraction of Sand, Stone & Bajri from Khasra No. 1558/1 (Govt. Land & River… — environmental approval granted, 0 m away
- Extraction of sand, stone & bajri by Sh. Vijay Mankotia and Sh. Pawan Singh… — environmental approval granted, 1.7 km away
- Extraction of Sand, Stone & Bajri from Khasra No. 1804/1 & 1806, measuring an… — lapsed, 1.9 km away
- Application for Extension of Environmental Clearance (EC) Validity for the… — lapsed, 4.2 km away
- Extraction of Sand, Stone, & Bajri from Khasra no, 29 & 31, Measuring an area… — environmental approval granted, 4.6 km away
- 220KV DC Transmission Line From Switchyard of 66MW Dhaulasidh Hydro Electric… — more information requested, 4.6 km away
- Stone, Sand & Bajri Mining Project, Khasra No. 801/747 — more information requested, 4.8 km away
- Extraction of stone, sand, and bajri at Khasra No. 801/747, covering an area… — withdrawn, 4.8 km away
More from Shiv Shakti Precast Industries in Kangra
- Extraction of Sand, Stone & Bajri from Khasra No. 1558/1 (Govt. Land & River… — environmental approval granted
All 3 Shiv Shakti Precast projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.