Quick answers
What is this project?
Extraction of Stone falling in Mauza Kammand, Mohal Khanar, Tehsil Sadar, District Mandi, Himachal Pradesh, Proposed by Sh. Prem Singh S/o Sh. Chet Ram, Prop. M/s Prem Stone Crusher is an approved mining project in Himgarh (510), Padhar, Mandi, Himachal Pradesh. The site covers 1.5 acres.
Who is building it?
The applicant is Prem Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Mar 2025), as of 27 Nov 2026.
Where is it?
In Himgarh (510), Padhar, Mandi, Himachal Pradesh.
How big is it?
It has a stated cost of ₹25 lakh and a site of 1.5 acres.
When was it filed?
The application was filed on 13 Dec 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Mar 2025 |
| Application filed | 13 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Prem Singh |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Himgarh (510) |
| Taluk / tehsil | Padhar |
| District | Mandi |
| State | Himachal Pradesh |
| Location from | Site area on record |
| Our reference | WID-HP-00315 |
In context
67 applications in Mandi since January 2022 are in the same category (Mining): 34 approved, 22 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.5 acres, this one is smaller than 63% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Himgarh (510), Padhar, Mandi, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Link road Kamand-Dawardu-Kutahar-Malwara 0/0 to 15/500 — more information requested, 2.1 km away
- Indian Institute of Technology (IIT) Mandi — initial checks, 2.2 km away
- Indian Institute of Technology (IIT) Mandi — under environmental review, 2.2 km away
- C/o Small Hydel Project Megal 0.10 MW — lapsed, 4.7 km away
- Extraction of Stone from Khasra No. 652/618/204, 203 & 205, measuring an area… — environmental approval granted, 5.6 km away
- Jorla- Darlog- Bodandhar- Kuthyar- Badon- Kufri road km 0/0 to 10/00 — lapsed, 5.7 km away
- Regularization of Already Constructed of Kundi Nallah to Harizan Basti… — more information requested, 5.8 km away
- Regularization of Already Constructed Link Road From Khaprehra to Balhi 0/00… — more information requested, 6.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.