Quick answers
What is this project?
Extraction of sand, stone & bajri in Khasra No. 97 measuring an area of 0-84-18 Hectare (Private land/ River Terrace) falling in Mauza/Mohal Chhatru, Tehsil Balh, District Mandi, H.P, proposed by Sh. Ashwani Kumar, S/o Late Sh. Ravi Singh is a proposed mining project in Althu (112), Mandi, Himachal Pradesh. The site covers 2.1 acres.
Who is building it?
The applicant is Ashwani Kumar.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Althu (112), Mandi, Himachal Pradesh.
How big is it?
It has a stated cost of ₹20 lakh and a site of 2.1 acres.
When was it filed?
The application was filed on 5 Nov 2025.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 10 Aug 2026 |
| Application filed | 5 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ashwani Kumar |
| Land area | 2.1 acres (0.8 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Althu (112) |
| Taluk / tehsil | Mandi |
| District | Mandi |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00362 |
In context
67 applications in Mandi since January 2022 are in the same category (Mining): 34 approved, 22 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.1 acres, this one is larger than 64% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Althu (112), Mandi, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Junior Engineer office Building — lapsed, 1.2 km away
- C/O Rajiv Gandhi Model Day Boarding School Balh Mandi H.P. — lapsed, 1.2 km away
- Extraction of Stone and Bajri from Khasra No. 609 over an area measuring… — environmental approval granted, 1.7 km away
- Extraction of Sand & Stone from Khasra nos. 610 & 611, over an area measuring… — under environmental review, 2.6 km away
- Diversion of (2.5043 Hect) Forest Land in Favour of Gangvir S/O Sant Ram Prop.… — lapsed, 3.4 km away
- "Stone Mining Project" — environmental approval granted, 3.6 km away
- Diversion of (1.2228 Hect) Forest Land in Favour of M/S Akhter Stone Crusher… — lapsed, 4.3 km away
- Double Lane Road to the Site of National Disaster Response Force (Ndrf) Km 0/0… — lapsed, 4.4 km away
More from Ashwani Kumar in Mandi
- Micro Hydel Project Luni 100 Kw — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.