Quick answers
What is this project?
Extraction of Stone from Tukra No.1, measuring an area 13-14-10 Bigha (Govt land, Hill Slope) Falling in Mauza Kotkandi, Tehsil Bhuntar, District Kullu, Himachal Pradesh: Proposed by Sh. Om Prakash, S/o Sh. Jyoti Prakash, Prop. M/s Manorma Crusher Unit is an approved mining project in Ansar (503), Aut, Mandi, Himachal Pradesh. The site covers 2.7 acres.
Who is building it?
The applicant is Manorma Stone Crusher.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Mar 2026), as of 27 Nov 2026.
Where is it?
In Ansar (503), Aut, Mandi, Himachal Pradesh.
How big is it?
It has a stated cost of ₹25 lakh and a site of 2.7 acres.
When was it filed?
The application was filed on 6 Apr 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Mar 2026 |
| Application filed | 6 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Manorma Stone Crusher |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Ansar (503) |
| Taluk / tehsil | Aut |
| District | Mandi |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00382 |
In context
67 applications in Mandi since January 2022 are in the same category (Mining): 34 approved, 22 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.7 acres, this one is larger than 69% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 6.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Ansar (503), Aut, Mandi, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for Extension of EC Validity for a hill slope mining project for… — under environmental review, 0 m away
- Extraction of stone from Khasra No. 3827/3599/3104/2 & 3828/3599/3104/3… — environmental approval granted, 150 m away
- Diversion of (1.1272 Hect) Forest land in favour of Gorsi River Bad Mining… — lapsed, 5.6 km away
- Construction of Helipad at Kotadhar (Panarsa) District Mandi (H.P.) — lapsed, 6.5 km away
- Beas River Bed Dredging — under forest review, 6.7 km away
- Regularization of Violation in respect of Link Road to village Kotadhar Km.… — initial checks, 7.1 km away
- Construction of Nau to Farsh road Km. 0/00 To 15/600 — more information requested, 7.6 km away
- Mobile Tower for providing Telecommunication Line/facilities — lapsed, 8.8 km away
More from Manorma Stone Crusher in Mandi
- Application for Extension of EC Validity for a hill slope mining project for… — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.