Quick answers
What is this project?
Transfer of Environmental Clearance for Non-ferrous metals complex to manufacture 60,000 MTPA of Aluminum road products and 36,000 MTPA of Aluminum extrusion profiles is a lapsed industrial project in Balir Lodhwan (7), Indora, Kangra, Himachal Pradesh. The site covers 47.4 acres.
Who is building it?
The applicant is Orissa Metaliks Private Limited.
Has it been approved?
No. The application was lapsed on 22 Aug 2026, so it is no longer under consideration.
Where is it?
In Balir Lodhwan (7), Indora, Kangra, Himachal Pradesh.
How big is it?
It has a stated cost of ₹200 crore and a site of 47.4 acres.
When was it filed?
The application was filed on 22 Sept 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Transfer of Environmental Clearance for Non-ferrous metals complex to manufacture 60,000…
Project details
| Official title | Transfer of Environmental Clearance for Non-ferrous metals complex to manufacture 60,000 MTPA of Aluminum road products and 36,000 MTPA of Aluminum extrusion profiles at Village Mohtli near Dhamtal, Tehsil Indora, District Kangra, Himachal Pradesh from M/s. Metenere Limited (Formerly, M/s. Met Trade India Limited) to M/s. Orissa Metaliks Private Limited |
|---|---|
| Status | Lapsed |
| Status since | 22 Aug 2026 |
| Application filed | 22 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Orissa Metaliks Private Limited |
| Land area | 47.4 acres (19.2 ha) |
| Project cost | ₹200 crore |
| Village / locality | Balir Lodhwan (7) |
| Taluk / tehsil | Indora |
| District | Kangra |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00390 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 6 Nov 2026 | Under environmental review | 30.4 acres | ₹200 crore |
| Ownership transfer filed 22 Sept 2025 (this page) | Lapsed | 47.4 acres | ₹200 crore |
In context
21 applications in Kangra since January 2022 are in the same category (Industry): 10 approved, 8 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 47.4 acres, this one is larger than 95% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Balir Lodhwan (7), Indora, Kangra, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Environmental Clearance for Non-ferrous metals complex to… — under environmental review, 100 m away
- Extraction of Sand, Stone, & Bajri falling in Mohal/Mauza Mohtali, Tehsil… — environmental approval granted, 1.1 km away
- Extraction of Sand, Stone, & Bajri falling in Mohal/Mauza Mohtali, Tehsil… — environmental approval granted, 1.1 km away
- Extraction/collection of sand, stone & bajri by Sh. Hari Prakash Abhi, Prop:-… — environmental approval granted, 1.3 km away
- Extraction/Collection of Sand, Stone and Bajri from Khasra Nos. 1386/1, 1227,… — environmental approval granted, 1.5 km away
- "Sand, Stone & Bajri Mining Project, Khasra No. 1390/3, 1391" — environmental approval granted, 1.5 km away
- Extraction of Sand, Stone, & Bajri from Khasra Nos. 1221, 1222, 1223, 1224,… — environmental approval granted, 1.5 km away
- Sand, Stone & Bajri Mining Project Khasra No. 131/2 — environmental approval granted, 1.8 km away
All 9 Orissa Metaliks projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.