Quick answers
What is this project?
20% Expansion of existing steel manufacturing unit by M/s Kundlas Loh Udyog is a lapsed industrial project in Balyana (202), Baddi, Solan, Himachal Pradesh. The site covers 3.3 acres.
Who is building it?
The applicant is Kundlas Loh Udyog.
Has it been approved?
No. The application was lapsed on 3 Feb 2026, so it is no longer under consideration.
Where is it?
In Balyana (202), Baddi, Solan, Himachal Pradesh.
How big is it?
It has a stated cost of ₹74.8 crore and a site of 3.3 acres.
When was it filed?
The application was filed on 29 Sept 2025.
Project details
| Official title | 20% Expansion of existing steel manufacturing unit located at Village Baliana, Tehsil Baddi, Distt. Solan, State Himachal Pradesh by M/s Kundlas Loh Udyog |
|---|---|
| Status | Lapsed |
| Status since | 3 Feb 2026 |
| Application filed | 29 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Kundlas Loh Udyog |
| Land area | 3.3 acres (1.3 ha) |
| Project cost | ₹74.8 crore |
| Village / locality | Balyana (202) |
| Taluk / tehsil | Baddi |
| District | Solan |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00399 |
In context
12 applications in Solan since January 2022 are in the same category (Industry): 7 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected. At 3.3 acres, this one is smaller than 83% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Balyana (202), Baddi, Solan, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for "no Increase in Pollution Load" Certificate for the Addition… — initial checks, 700 m away
- Capacity Enhancement of existing steel manufacturing plant with increase in… — returned to applicant, 700 m away
- Capacity Enhancement of existing steel manufacturing plant with increase in… — cleared for impact study, 700 m away
- Application for "no Increase in Pollution Load" Certificate for the Addition… — initial checks, 700 m away
- Proposed Real Estate Project for Plotted Development namely Crown Residences… — lapsed, 1.9 km away
- Sh. Jatinder Singh, Prop: M/s Singh Stone Crusher — environmental approval granted, 2 km away
- "Transfer of EC" for Extraction of Sand, Stone and Bajri from Kh. Nos. 1668/1,… — environmental approval granted, 2.1 km away
- Proposed Real Estate Housing Colony of M/s Aashirvad Developers and Promoters… — initial checks, 2.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.