Quick answers
What is this project?
Application for extension of EC validity proposal for extraction Stone from Khasra No. 1244, 1246, 1247, 1248, 1249 & 1250 measuring an area 01-62-35 Ha, (Pvt land/Hill slope) falling in Mauza Dargi, Tehsil Sunni, District Shimla, Himachal Pradesh, Proposed by Sh. Vipin Sharma, M/s Jai Mateshwari Stone Crusher, Village & P.O Dargi, Tehsil Sunni, District Shimla, H.P is an approved mining project in Kariah (79), Arki, Solan, Himachal Pradesh. The site covers 4 acres.
Who is building it?
The applicant is Vipin Sharma.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Apr 2025), as of 27 Nov 2026.
Where is it?
In Kariah (79), Arki, Solan, Himachal Pradesh.
How big is it?
It has a stated cost of ₹20 lakh and a site of 4 acres.
When was it filed?
The application was filed on 7 Apr 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Apr 2025 |
| Application filed | 7 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Vipin Sharma |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Kariah (79) |
| Taluk / tehsil | Arki |
| District | Solan |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00420 |
In context
70 applications in Solan since January 2022 are in the same category (Mining): 54 approved, 7 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4 acres, this one is smaller than 54% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Kariah (79), Arki, Solan, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dev Harsang dhar (Harsangdhar Bhagal Bhajji) Dharmik Utthan Avam Kalyan Sabha — more information requested, 4.8 km away
- Construction of Link Road From Mangoo Malaun KM 0/000 to 12/000. — lapsed, 5 km away
- Mobile Tower for providing Telecommunication Line/Facilities — lapsed, 6.5 km away
- Mobile Tower for providing Telecommunication Line/Facilities — lapsed, 6.6 km away
- Mobile Tower for providing Telecommunication Line/Facilities — lapsed, 7.9 km away
- Stone Mining Project — environmental approval granted, 10 km away
- Construction of Outdoor Stadium at Darlaghat (Budmu) Tehsil Arki Distt. Solan — initial checks, 10.2 km away
- Mobile tower for providing Telecommunication Line/Facilities — lapsed, 10.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.