What is Developing? Open the mapMap

Under environmental reviewMining · Kangra, Himachal Pradesh

Extraction of Sand, Stone and Bajri from Khasra no. 3 over an area measuring 03-60-77 Ha (Pvt. Land- River bed of Chakki Khad) falling

Extraction of Sand, Stone and Bajri from Khasra no. 3 over an area measuring 03-60-77 Ha (Pvt. Land- River bed of Chakki Khad) falling is a proposed mining project in Tuta Tala (9), Indora, Kangra, Himachal Pradesh. The site covers 8.9 acres. Its stated project cost is ₹30 lakh. As of 27 Nov 2026, its status is “Under environmental review” (since 24 Jul 2026).

See it on the live map All projects in Kangra

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Extraction of Sand, Stone and Bajri from Khasra no. 3 over an area measuring 03-60-77 Ha (Pvt. Land- River bed of Chakki Khad) falling is a proposed mining project in Tuta Tala (9), Indora, Kangra, Himachal Pradesh. The site covers 8.9 acres.

Who is building it?

The applicant is Vishal Chambyal.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Tuta Tala (9), Indora, Kangra, Himachal Pradesh.

How big is it?

It has a stated cost of ₹30 lakh and a site of 8.9 acres.

When was it filed?

The application was filed on 12 Jun 2026.

Project details

Official titleExtraction of Sand, Stone and Bajri from Khasra no. 3 over an area measuring 03-60-77 Ha (Pvt. Land- River bed of Chakki Khad) falling in Mohal/Mauza Lodhwan/Tipri of Tehsil Indora, District Kangra, Himachal Pradesh by Sh. Vishal Chambial, Prop. M/s J.V. Stone Crusher, Village Tipri, Tehsil Indora, District Kangra, H.P.
StatusUnder environmental review
Status since24 Jul 2026
Application filed12 Jun 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantVishal Chambyal
Land area8.9 acres (3.6 ha)
Project cost₹30 lakh
Village / localityTuta Tala (9)
Taluk / tehsilIndora
DistrictKangra
StateHimachal Pradesh
Location fromSite boundary on record
Our referenceWID-HP-00599

In context

131 applications in Kangra since January 2022 are in the same category (Mining): 91 approved, 25 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 8.9 acres, this one is smaller than 62% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 42.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.

Where it is

Tuta Tala (9), Indora, Kangra, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Vishal Chambyal in Kangra

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.