What is Developing? Open the mapMap

Initial checksMining · Hamirpur, Himachal Pradesh

Extraction of Sand, Stone and Bajri from Khasra No. 432/1, measuring an area 01-07-42 Hectare (Private land, River Bed), falling in Mauza Bharoli, Mohal Bharoli Kutiyara, Tehsil Jawalamukhi, District Kangra, Himachal Pradesh, proposed by Sh. Satish Kumar Walia, S/o Sh. Nathu Ram

Extraction of Sand, Stone and Bajri from Khasra No. 432/1, measuring an area 01-07-42 Hectare (Private land, River Bed), falling in Mauza Bharoli, Mohal Bharoli Kutiyara, Tehsil Jawalamukhi, District Kangra, Himachal Pradesh, proposed by Sh. Satish Kumar Walia, S/o Sh. Nathu Ram is a proposed mining project in Andara (22/2), Nadaun, Hamirpur, Himachal Pradesh. The site covers 5.3 acres. Its stated project cost is ₹30 lakh. As of 27 Nov 2026, its status is “Initial checks” (since 19 Oct 2026).

See it on the live map All projects in Hamirpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Extraction of Sand, Stone and Bajri from Khasra No. 432/1, measuring an area 01-07-42 Hectare (Private land, River Bed), falling in Mauza Bharoli, Mohal Bharoli Kutiyara, Tehsil Jawalamukhi, District Kangra, Himachal Pradesh, proposed by Sh. Satish Kumar Walia, S/o Sh. Nathu Ram is a proposed mining project in Andara (22/2), Nadaun, Hamirpur, Himachal Pradesh. The site covers 5.3 acres.

Who is building it?

The applicant is Satish Walia.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Andara (22/2), Nadaun, Hamirpur, Himachal Pradesh.

How big is it?

It has a stated cost of ₹30 lakh and a site of 5.3 acres.

When was it filed?

The application was filed on 19 Oct 2026.

Project details

StatusInitial checks
Status since19 Oct 2026
Application filed19 Oct 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantSatish Walia
Land area5.3 acres (2.2 ha)
Project cost₹30 lakh
Village / localityAndara (22/2)
Taluk / tehsilNadaun
DistrictHamirpur
StateHimachal Pradesh
Location fromSite boundary on record
Our referenceWID-HP-00609

In context

51 applications in Hamirpur since January 2022 are in the same category (Mining): 38 approved, 8 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 5.3 acres, this one is smaller than 78% of them.

No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.

Where it is

Andara (22/2), Nadaun, Hamirpur, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.