Quick answers
What is this project?
Commercial Hospitality Project namely "Taj Vivanta" to be constructed by M/s Dhauladhar Resorts Private Limited is an approved commercial project in Tangh (508), Dharmsala, Kangra, Himachal Pradesh. It plans 106 units of up to 6 floors on 3.7 acres.
Who is building it?
The applicant is Dhauladhar Resorts Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 17 Jul 2026), as of 27 Nov 2026.
Where is it?
In Tangh (508), Dharmsala, Kangra, Himachal Pradesh.
How big is it?
It has a stated cost of ₹111.8 crore and a site of 3.7 acres.
When was it filed?
The application was filed on 11 Mar 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 17 Jul 2026 |
| Application filed | 11 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Dhauladhar Resorts Private Limited |
| Use | Commercial |
| Units | 106 |
| Floors (tallest) | 6 |
| Basements | 1 |
| Parking spaces | 396 |
| Land area | 3.7 acres (1.5 ha) |
| Built-up area | 31,130 m² (3,35,080 sq ft) |
| Plot area | 14,906 m² (1,60,447 sq ft) |
| Project cost | ₹111.8 crore |
| Village / locality | Tangh (508) |
| Taluk / tehsil | Dharmsala |
| District | Kangra |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00679 |
In context
15 applications in Kangra since January 2022 are in the same category (Buildings & townships): 7 approved, 1 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.7 acres, this one is smaller than 87% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tangh (508), Dharmsala, Kangra, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of Heliport at Rakkar in Tehsil Dharamshala, District Kangra — forest land use approved, 1.1 km away
- Rajiv Gandhi Day Boarding School at Dharamshala — lapsed, 1.3 km away
- Proposed Convention Centre by Himachal Pradesh Tourism Development Board — environmental approval granted, 2.4 km away
- Iku Kuhal Small Hydro Project at village Salag Tehsil Dharamshala — lapsed, 3.8 km away
- MOBILE TOWER FOR PROVIDING TELECOMMUNICATION LINE/FACILITIES AT bhangotu — lapsed, 4.5 km away
- Mobile Tower for Providing Telecommunication Line/Facilities at Bhangotu — lapsed, 4.7 km away
- Link road from Ramehar Tangroti Dhaloon Road — lapsed, 4.8 km away
- Diversion of Forest Land for construction of Mobile Tower near Forest area,… — lapsed, 4.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.