Project details
| Official title | Installation of Mobile Tower for providing Telecommunication Line/Facilities at Village Rihana |
|---|---|
| Status | Lapsed |
| Status since | 13 Feb 2023 |
| Application filed | 11 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹1.3 crore |
| Village / locality | Karang (101) |
| Taluk / tehsil | Rajgarh |
| District | Sirmaur |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00834 |
In context
14 applications in Sirmaur since January 2022 are in the same category (Buildings & townships): 1 approved, 0 filed or under review, and 13 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Karang (101), Rajgarh, Sirmaur, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Providing Sewerage Scheme to Rajgarh Town NAC Rajgarh — lapsed, 5 km away
- C/o Existing Road Fagu Bathaudhar Km. 0/0 to 10/0 within the Jurisdiction of… — lapsed, 6.5 km away
- Stone Mining Project Area 4.2146 Hact. Mauza and Mohal Badu Sahib Tehsil… — environmental approval granted, 8.3 km away
- Hill Slope mining for extraction of Limestone proposed by Sh. Hardev Singh… — not approved, 9.1 km away
- Hill Slope mining for extraction of Limestone mine proposed by Sh. Hardev… — environmental approval granted, 9.1 km away
- Transfer of prior Environmental Clearance granted in favor of "Sh. Dev Dutt… — environmental approval granted, 11 km away
- Extraction of sand, stone & bajri in the mining lease area measuring 19-13… — withdrawn, 11 km away
- Extraction of Stone and Sand by Shri. Dev Dutt — environmental approval granted, 11 km away
More from Mahesh Nair in Sirmaur
- Mobile Tower for providing Telecommunication Line/Facilities — lapsed
- Mobile Tower for providing Telecommunication Line/Facilities — lapsed
- Mobile Tower for providing Telecommunication Line/Facilities — lapsed
- Mobile Tower for providing Telecommunication Line/Facilities — lapsed
- Mobile Tower for providing Telecommunication Line/Facilities — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.