Quick answers
What is this project?
C/o Solid Waste Management Plant at Ghumarwin Distt. Bilaspur is a lapsed waste management project in Bah (305), Bharari, Bilaspur, Himachal Pradesh. The site covers 952.8 acres.
Who is building it?
The applicant is E O Municipal Council Ghumarwin.
Has it been approved?
No. The application was lapsed on 13 Aug 2024, so it is no longer under consideration.
Where is it?
In Bah (305), Bharari, Bilaspur, Himachal Pradesh.
How big is it?
It has a stated cost of ₹70 lakh; a site of 952.8 acres and 3,010 m² of forest land.
When was it filed?
The application was filed on 27 Mar 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Aug 2024 |
| Application filed | 27 Mar 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Waste management |
| Applicant | E O Municipal Council Ghumarwin |
| Land area | 952.8 acres (385.6 ha) |
| Forest land | 3,010 m² |
| Project cost | ₹70 lakh |
| Village / locality | Bah (305) |
| Taluk / tehsil | Bharari |
| District | Bilaspur |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-01110 |
In context
27 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bah (305), Bharari, Bilaspur, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- C/O Circular Road around Nagar Parishad Ghumarwin Km 0/00 to 1/900 (… — lapsed, 1.2 km away
- C/O Circular Road around Nagar Parishad Ghumarwin Km 0/00 to 2/405 ( Tikkari)… — lapsed, 1.3 km away
- C/O Dabla Gatol Randoh Road Km 0/00 to 2/00 under HPPWD Division Ghumarwin… — lapsed, 2.4 km away
- C/O Galasin Gatol Road Km 0/00 to 3/00under HPPWD Division Ghumarwin Distt.… — lapsed, 2.9 km away
- Providing Sewerage Scheme to left out area of M.C Ghumarwin — more information requested, 3.3 km away
- Establishment MIISTER University at Ghumarwin — more information requested, 3.3 km away
- C/O Road from Kasol to Ghayana Km 0/00 to 1/100 under HPPWD Division No.-I… — lapsed, 4 km away
- Construction of Link Road from Kasol to Balh II KM 0/000 to 1/000. — lapsed, 4.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.