Quick answers
What is this project?
Augmentation of Source of various LWSS from River Satluj under Barsar Area (Barsar Constituency) is a lapsed project in Barsar (13/1), Barsar, Hamirpur, Himachal Pradesh. The site covers 0.6 acres.
Who is building it?
The applicant is Jal Shakti Vibhag.
Has it been approved?
No. The application was lapsed on 6 Sept 2024, so it is no longer under consideration.
Where is it?
In Barsar (13/1), Barsar, Hamirpur, Himachal Pradesh.
How big is it?
It has a stated cost of ₹137.4 crore; a site of 0.6 acres and 4.7 acres (1.9 ha) of forest land.
When was it filed?
The application was filed on 5 Sept 2024.
Project details
| Official title | Augmentation of Source of various LWSS from River Satluj under Barsar Area (Barsar Constituency) in Tehsil Barsar Distt. Hamirpur (H.P.). |
|---|---|
| Status | Lapsed |
| Status since | 6 Sept 2024 |
| Application filed | 5 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Jal Shakti Vibhag |
| Land area | 2,600 m² |
| Forest land | 4.7 acres (1.9 ha) |
| Project cost | ₹137.4 crore |
| Village / locality | Barsar (13/1) |
| Taluk / tehsil | Barsar |
| District | Hamirpur |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-01738 |
In context
12 applications in Hamirpur since January 2022 are in the same category (Other): 3 approved, 4 filed or under review, and 5 withdrawn, lapsed or rejected. At 0.6 acres, this one is smaller than 100% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Barsar (13/1), Barsar, Hamirpur, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Test 01 — lapsed, 1.4 km away
- PWD Colony Mehre to Seri via Makteri Road 0/00 to 1/640 Km — initial checks, 1.5 km away
- Construction of Link Road Salauni Kuthiana Km 0/000 to 7/000. — lapsed, 1.5 km away
- Link Road Uled Dhamani via Choa Khansara KM. 0/000 to 4/000 — lapsed, 1.5 km away
- Construction of Link road Bhota Dain via Mansui Road Km 0/00 to 3/00 — lapsed, 2.4 km away
- Construction of Link road Chakmoh Railly Jajri km 12 — lapsed, 2.4 km away
- Construction of Link roaoh Nalwd Chakmar Bhater km 5/500 — lapsed, 2.4 km away
- Construction of Link Road From Joure Amb Karsai Km 0/000 to 4/000. — initial checks, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.