One of 2 filings for this project. The project's main page, with every filing and where each stands: C/o Sainj SHEP 5 MW
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Apr 2026 |
| Application filed | 13 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | M/S Nortia Power (P) Ltd.(Sco No.5,block No.2, Sda Commercial Complex, Kasumpati,shimla-171009.) |
| Land area | 6.7 acres (2.7 ha) |
| Forest land | 6.7 acres (2.7 ha) |
| Project cost | ₹48.4 crore |
| Village / locality | Raila (42/105) |
| Taluk / tehsil | Sainj |
| District | Kullu |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-01762 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Jun 2024 | More information requested | 29.3 acres | ₹48.4 crore |
| New project filed 13 Sept 2023 (this page) | Lapsed | 6.7 acres | ₹48.4 crore |
In context
28 applications in Kullu since January 2022 are in the same category (Water & irrigation): 0 approved, 9 filed or under review, and 19 withdrawn, lapsed or rejected. At 6.7 acres, this one is larger than 59% of them.
Where it is
Raila (42/105), Sainj, Kullu, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- C/o Sainj SHEP 5 MW — more information requested, 50 m away
- NIharni 5.00 MW — more information requested, 7.9 km away
- Jiwa-II — application filed, 8 km away
- Jiwa-II — application filed, 8 km away
- Thosko Sharn SHEP (1.0 MW) — lapsed, 8 km away
- Lower Kotlu (4.5 MW) — lapsed, 8.1 km away
- Parbati HE Project Stage-II (NHPC Limited) — lapsed, 8.1 km away
- C/O Plastic waste management unit at H Ropa, Village Suchehan Distt. Kullu — lapsed, 8.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.