Quick answers
What is this project?
Ex-Post Facto Approval for the C/O Additional Hill Cutting in Kiratpur-Nerchowk National Highway Between Chainage 15+400 to 15+640 (Rl), 18+390 to 18+550 (Rl) and 18+860 to 19+020 (Rl) Within the Jurisdiction of Bilaspur Forest Division, Distt. Bilaspur, H.P is a proposed road project in Dadwal (319), Naina Devi, Bilaspur, Himachal Pradesh. The site covers 4.7 acres.
Who is building it?
The applicant is National Highways Authority of India (NHAI).
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Dadwal (319), Naina Devi, Bilaspur, Himachal Pradesh.
How big is it?
It has a stated cost of ₹85 crore; a site of 4.7 acres and 3.4 acres (1.4 ha) of forest land.
When was it filed?
The application was filed on 5 Oct 2026.
Project details
| Status | Under forest review |
|---|---|
| Status since | 2 Nov 2026 |
| Application filed | 5 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | National Highways Authority of India (NHAI) |
| Land area | 4.7 acres (1.9 ha) |
| Forest land | 3.4 acres (1.4 ha) |
| Project cost | ₹85 crore |
| Village / locality | Dadwal (319) |
| Taluk / tehsil | Naina Devi |
| District | Bilaspur |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-02184 |
In context
113 applications in Bilaspur since January 2022 are in the same category (Roads & highways): 0 approved, 11 filed or under review, and 102 withdrawn, lapsed or rejected. At 4.7 acres, this one is smaller than 65% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dadwal (319), Naina Devi, Bilaspur, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- C/O Road from Zakatkhana to Bhater Km 0/00 to 2/00 under HPPWD Sub-Division… — lapsed, 400 m away
- C/O Link Road Panjpoura to Oel Via Dakshni Kallari Km. 0/0 to 9/075 — more information requested, 800 m away
- C/O Link Road From Kutehla Kiyarin Bagchhal Road to Village Sunhan Km. 0/0 to… — lapsed, 800 m away
- C/O Swaraghat Zakatkhana road at RD 4/600 to Kuthela Km 0/00 to 3/00 under… — lapsed, 2.1 km away
- C/O Link Road to village Panga, Kathla in GP Kutheda Km 0/00 to 3/00 under… — lapsed, 2.5 km away
- Rajeev Gandhi Day Boarding School — lapsed, 2.9 km away
- Bhanupali Bilaspur Beri New Rail Line, Phase-V, from Km. 27.720 to Km. 34.470 — forest land use approved, 2.9 km away
- C/O NH-21 at RD 92/800 to Kathla Km 0/00 to 2/500 under HPPWD Sub-Division… — lapsed, 3.8 km away
More from National Highways Authority of India (NHAI) in Bilaspur
- Two Lane Single Tube Tunnel (Tunnel-2 from Km 15+380 to Km 16+600) in Kiratpur… — more information requested
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.