Quick answers
What is this project?
Missing Link from Birhu to Lathiani from Km 35/550 (Design chainage Km 0.000) to Km 42/800 (Design Chainage Km 8.153) On NH-503A Including Lathiani 4 lane HL/Extradosed Cable Bridge on Back Water of Govind Sagar and Its Approaches is a lapsed road project in Adarin (30/15), Barsar, Hamirpur, Himachal Pradesh. The site covers 2.9 acres.
Who is building it?
The applicant is Executive Engineer NH Division Hamirpur.
Has it been approved?
No. The application was lapsed on 1 Jun 2023, so it is no longer under consideration.
Where is it?
In Adarin (30/15), Barsar, Hamirpur, Himachal Pradesh.
How big is it?
It has a stated cost of ₹89 lakh; a site of 2.9 acres and 2.9 acres (1.2 ha) of forest land.
When was it filed?
The application was filed on 1 Jun 2023.
Project details
| Official title | Construction of Missing Link from Birhu to Lathiani from Km 35/550 (Design chainage Km 0.000) to Km 42/800 (Design Chainage Km 8.153) On NH-503A Including Lathiani 4 lane HL/Extradosed Cable Bridge on Back Water of Govind Sagar and Its Approaches in Una District in State of Himachal Pradesh |
|---|---|
| Status | Lapsed |
| Status since | 1 Jun 2023 |
| Application filed | 1 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer NH Division Hamirpur |
| Land area | 2.9 acres (1.2 ha) |
| Forest land | 2.9 acres (1.2 ha) |
| Project cost | ₹89 lakh |
| Village / locality | Adarin (30/15) |
| Taluk / tehsil | Barsar |
| District | Hamirpur |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-02334 |
In context
34 applications in Hamirpur since January 2022 are in the same category (Roads & highways): 1 approved, 20 filed or under review, and 13 withdrawn, lapsed or rejected. At 2.9 acres, this one is smaller than 77% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Adarin (30/15), Barsar, Hamirpur, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of Link Road Kharol Ghangot Shahtalai Road Via Nain 5 Km — lapsed, 2.6 km away
- Construction of Barsar Gujrera Loharwin Road 0/00 to 11/815 km — initial checks, 2.6 km away
- Construction of Link Road From Khorpa Bair Km 0/000 to 5/750. — initial checks, 2.6 km away
- Construction of Link road Bhota Dain via Mansui Road Km 0/00 to 3/00 — lapsed, 4.5 km away
- Construction of Link road Chakmoh Railly Jajri km 12 — lapsed, 4.5 km away
- Construction of Link roaoh Nalwd Chakmar Bhater km 5/500 — lapsed, 4.5 km away
- PWD Colony Mehre to Seri via Makteri Road 0/00 to 1/640 Km — initial checks, 4.8 km away
- Construction of Link Road Salauni Kuthiana Km 0/000 to 7/000. — lapsed, 4.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.