What is Developing? Open the mapMap

Cleared for impact studyMining · Palwal, Haryana

Mining of Sand (Minor Mineral) from the Riverbed of Yamuna River (Sultanpur Unit) with 10,80,000 MT/ year production over an area of 33.42 Ha

Mining of Sand (Minor Mineral) from the Riverbed of Yamuna River (Sultanpur Unit) with 10,80,000 MT/ year production over an area of 33.42 Ha is a proposed mining project in Atba, Palwal, Haryana. The site covers 82.6 acres. Its stated project cost is ₹50 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 10 Nov 2022).

See it on the live map All projects in Palwal

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Mining of Sand (Minor Mineral) from the Riverbed of Yamuna River (Sultanpur Unit) with 10,80,000 MT/ year production over an area of 33.42 Ha is a proposed mining project in Atba, Palwal, Haryana. The site covers 82.6 acres.

Who is building it?

The applicant is M/S M.M Traders.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 10 Nov 2022), as of 27 Nov 2026.

Where is it?

In Atba, Palwal, Haryana.

How big is it?

It has a stated cost of ₹50 lakh and a site of 82.6 acres.

When was it filed?

The application was filed on 10 Nov 2022.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Mining of Sand (Minor Mineral) from the Riverbed of Yamuna River (Sultanpur Unit) with…

Project details

StatusCleared for impact study
Status since10 Nov 2022
Application filed10 Nov 2022
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantM/S M.M Traders
Land area82.6 acres (33.4 ha)
Project cost₹50 lakh
Village / localityAtba
Taluk / tehsilPalwal
DistrictPalwal
StateHaryana
Location fromTaluk / tehsil
Our referenceWID-HR-00009

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Validity extension filed 11 Feb 2026Environmental approval granted82.6 acres₹50 lakh
New project filed 15 May 2023Environmental approval granted82.6 acres₹50 lakh
Early planning filed 10 Nov 2022 (this page)Cleared for impact study82.6 acres₹50 lakh

In context

12 applications in Palwal since January 2022 are in the same category (Mining): 10 approved, 0 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 82.6 acres, this one is smaller than 100% of them.

Where it is

Atba, Palwal, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from M/S M.M Traders in Palwal

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.