| Status | Returned to applicant |
|---|---|
| Status since | 9 May 2024 |
| Application filed | 27 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Aravalli Biofuels Private Limited |
| Land area | 3.1 acres (1.3 ha) |
| Project cost | ₹66.5 crore |
| Village / locality | Maham |
| Taluk / tehsil | Maham |
| District | Rohtak |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00094 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Jun 2024 | Lapsed | 3.1 acres | ₹66.5 crore |
| New project filed 27 Mar 2024 (this page) | Returned to applicant | 3.1 acres | ₹66.5 crore |
In context
19 applications in Rohtak since January 2022 are in the same category (Industry): 12 approved, 1 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 1 months from filing to approval. At 3.1 acres, this one is smaller than 58% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Maham, Rohtak, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 30 KLD Grain based Bioethanol Plant and By- Product of Distillers… — cleared for impact study, 0 m away
- Proposed Manufacturing of Grain Based Ethanol (30 KLD) And By Product of… — lapsed, 0 m away
- New retail out let of RBP Mobility Ldt. at Village Meham Distt Rohtak — forest land use approved, 5.4 km away
- Diversion of Forest Land for access to proposed iocl Retail Outlet between Km… — forest land use approved, 6.3 km away
- DIVERSION OF FOREST LAND FOR APPROACH ACCESS TO THE PROPOSED SITE OF M/s… — forest land use approved, 10.1 km away
- Water Park of M/s Aqua Fun — more information requested, 12.1 km away
- Diversion of Forest Land of 0.0111Ha. for access to Plotting belonging to… — lapsed, 12.1 km away
- Diversion of Forest Land for Laying of Railway Track — under forest review, 12.4 km away
More from Aravalli Biofuels Private Limited in Rohtak
- Proposed 30 KLD Grain based Bioethanol Plant and By- Product of Distillers… — cleared for impact study
All 3 Aravalli Biofuels projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.