One of 2 filings for this project. The project's main page, with every filing and where each stands: Environment Clearance for expansion of Mining of Sand (Minor Mineral) from the Riverbed…
Project details
| Official title | Environment Clearance for expansion of Mining of Sand (Minor Mineral) from the Riverbed of Yamuna River in MT Karhera Block (YNR B-13) with 28,50,000 MT/ year production (Production increased from 21.0 Lacs to 28.5 Lacs TPA) over an area of 67.79 ha located at Village MT Karhera, Tehsil Radaur & District Yamuna Nagar and State Haryana |
|---|---|
| Status | Cleared for impact study |
| Status since | 1 Mar 2023 |
| Application filed | 1 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Kawaljeet Singh Batra |
| Land area | 167.5 acres (67.8 ha) |
| Project cost | ₹8.4 crore |
| Village / locality | Karhera (30) |
| Taluk / tehsil | Radaur |
| District | Yamunanagar |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00097 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 5 May 2023 | Environmental approval granted | 167.5 acres | ₹8.4 crore |
| Early planning filed 1 Mar 2023 (this page) | Cleared for impact study | 167.5 acres | ₹8.4 crore |
In context
8 applications in Yamunanagar since January 2022 are in the same category (Mining): 6 approved, 0 filed or under review, and 2 withdrawn, lapsed or rejected.
No other mining lease on record has applied within 5 km of this site.
Where it is
Karhera (30), Radaur, Yamunanagar, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environment Clearance for expansion of Mining of Sand (Minor Mineral) from the… — environmental approval granted, 0 m away
- Diversion of forest land 0.0595Ha. for access to Retail Outlet on Jathlana -… — forest land use approved, 1.7 km away
- Capacity Expansion of Formaldehyde Manufacturing Unit in Existing Facility… — under environmental review, 4.8 km away
- Capacity Expansion of Formaldehyde Manufacturing Unit in Existing Facility… — lapsed, 4.8 km away
- Industrial project by M/s Sili Kalan Farmers Producer Company — lapsed, 4.8 km away
- Tourism project by M/s Karan Resort — lapsed, 4.8 km away
- Hpcl Retail Outlet Rajheri — forest land use approved, 5.3 km away
- Proposed Synthetic Resin Manufacturing Unit by M/s Royal Wood Industries — cleared for impact study, 5.4 km away