Quick answers
What is this project?
Environment Clearance for Integrated Solid Waste Management Project is a proposed waste management project in Bakarianwali(40), Nathusari Chopta, Sirsa, Haryana. The site covers 13 acres.
Who is building it?
The applicant is Pooja Waste Management Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 17 Nov 2023), as of 27 Nov 2026.
Where is it?
In Bakarianwali(40), Nathusari Chopta, Sirsa, Haryana.
How big is it?
It has a stated cost of ₹5 crore and a site of 13 acres.
When was it filed?
The application was filed on 17 Nov 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Environment Clearance for Integrated Solid Waste Management Project
Project details
| Official title | Environment Clearance for Integrated Solid Waste Management Project at Bakarianwali village Sirsa Haryana |
|---|---|
| Status | Cleared for impact study |
| Status since | 17 Nov 2023 |
| Application filed | 17 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Waste management |
| Applicant | Pooja Waste Management Private Limited |
| Land area | 13 acres (5.3 ha) |
| Project cost | ₹5 crore |
| Village / locality | Bakarianwali(40) |
| Taluk / tehsil | Nathusari Chopta |
| District | Sirsa |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00219 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Aug 2024 | Environmental approval granted | 13 acres | ₹5 crore |
| Early planning filed 17 Nov 2023 (this page) | Cleared for impact study | 13 acres | ₹5 crore |
In context
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bakarianwali(40), Nathusari Chopta, Sirsa, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environment Clearance for Integrated Solid Waste Management Project — environmental approval granted, 0 m away
- M/s Sapphire Resort on Sirsa-Jamal Road Km 11.750 (RHS) — forest land use approved, 1.6 km away
- Access to M/s SRK Interlocking Udyog — lapsed, 2.2 km away
- Access to Weigh Bridge of Sh.Dharam Pal S/o Sh. Hira Ram — lapsed, 2.4 km away
- Access to Industrial Unit of Smt.Sanju Bansal W/o Sh. Ashok Bansal — lapsed, 2.7 km away
- Access to Jai Hanuman Foundry & Engineering Works — forest land use approved, 3.2 km away
- Access to IOCL Retail outlet along Sirsa-Jamal Road Khasra No. 103//10/1 — forest land use approved, 3.2 km away
- Uttam Agro Industries — lapsed, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.