One of 3 filings for this project. The project's main page, with every filing and where each stands: Existing Formaldehyde manufacturing unit of 130 TPD Capacity by M/S Apcolite Polymers…
Project details
| Official title | Existing Formaldehyde manufacturing unit of 130 TPD Capacity at Village- Ghespur, Radaur, District Yamuna Nagar, Haryana by M/S Apcolite Polymers Pvt. Ltd. |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 12 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Apcolite Polymers Private Limited |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹2.3 crore |
| Village / locality | Ghespur |
| Taluk / tehsil | Radaur |
| District | Yamunanagar |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00226 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 12 Jun 2023 (this page) | Lapsed | 2.7 acres | ₹2.3 crore |
| Early planning filed 12 Jun 2023 | Lapsed | 2.7 acres | ₹2.3 crore |
| New project filed 2 Jun 2023 | Lapsed | 2.7 acres | ₹2.3 crore |
In context
77 applications in Yamunanagar since January 2022 are in the same category (Industry): 12 approved, 16 filed or under review, and 49 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 2.7 acres, this one is larger than 72% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ghespur, Radaur, Yamunanagar, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Existing Formaldehyde manufacturing unit of 130 TPD Capacity by M/S Apcolite… — lapsed, 0 m away
- Formaldehyde Manufacturing Unit With Production Capacity 130 Tpd by M/S… — lapsed, 0 m away
- Existing Formaldehyde manufacturing unit of 130 TPD Capacity by M/S Apcolite… — lapsed, 0 m away
- Hafed Turmeric Plant — lapsed, 800 m away
- Diversion of forest land of 0.8543Ha. for Strengthening of Berm of S.K. road… — under forest review, 950 m away
- Side Drain on Saharanpur Kurukshetra Road — lapsed, 1.2 km away
- Establishment of camp at Village Dholra by M/s Apco Infratech Pvt. — lapsed, 1.3 km away
- Diversion of 2.34 Ha. of Forest Land for Laying of Interlocking Tiles (IPB) on… — lapsed, 1.5 km away
More from Apcolite Polymers Private Limited in Yamunanagar
All 4 Apcolite Polymers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.