Quick answers
What is Expansion of River Bed Mining Project at Kot Block/PKL B-8&9?
Expansion of River Bed Mining Project at Kot Block/PKL B-8&9 is an approved mining project in Dabkauri, Panchkula, Haryana. The site covers 78.1 acres.
Who is building it?
The applicant is Amandeep Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 Jan 2025), as of 27 Nov 2026.
Where is it?
In Dabkauri, Panchkula, Haryana.
How big is it?
It has a stated cost of ₹8.2 crore and a site of 78.1 acres.
When was it filed?
The application was filed on 19 Sept 2024.
Project details
| Official title | Expansion of River Bed Mining Project at Kot Block/PKL B-8&9 at Village Kot and Dabkori Capacity Increase from 2.96 LTPA to 8.9 LTPA over an area of 31.59 ha |
|---|---|
| Status | Environmental approval granted |
| Status since | 24 Jan 2025 |
| Application filed | 19 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | Amandeep Singh |
| Land area | 78.1 acres (31.6 ha) |
| Project cost | ₹8.2 crore |
| Village / locality | Dabkauri |
| Taluk / tehsil | Panchkula |
| District | Panchkula |
| State | Haryana |
| Location from | Site area on record |
| Our reference | WID-HR-00283 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 19 Sept 2024 (this page) | Environmental approval granted | 78.1 acres | ₹8.2 crore |
| Early planning filed 12 Jul 2023 | Cleared for impact study | 78.1 acres | ₹8.2 crore |
In context
20 applications in Panchkula since January 2022 are in the same category (Mining): 15 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 78.1 acres, this one is smaller than 60% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 234.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Dabkauri, Panchkula, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- River Bed Mining project Kot Block/PKL B-8&9 — environmental approval granted, 450 m away
- River Bed Material (Gravel & sand) Kot Block/PKL B- 8&9 — environmental approval granted, 450 m away
- River Bed Material (Gravel & sand) Kot Block/PKL B- 8&9 — environmental approval granted, 450 m away
- Expansion of River Bed Mining Project at Kot Block/PKL B-8&9 — cleared for impact study, 450 m away
- Diversion of 0.0062 Ha. of Forest Land for Access to Approach Road From the… — lapsed, 550 m away
- API Manufacturing Project by M/s Pharmaffiliates Analytics & Synthetics Pvt. Ltd — environmental approval granted, 1.8 km away
- Diversion of forest Land for approach access to proposed site for setting up… — forest land use approved, 2.2 km away
- Diversion of forest land for Proposed Site for Construction of Pulliya — lapsed, 2.3 km away
More from Amandeep Singh in Panchkula
- River Bed Material (Gravel & sand) Kot Block/PKL B- 8&9 — environmental approval granted
- River Bed Material (Gravel & sand) Kot Block/PKL B- 8&9 — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.