What is Developing? Open the mapMap

Cleared for impact studyBuildings & townships · Gurugram, Haryana

Proposed expansion of existing Industrial shed for automobile manufacturing unit at Plot No.01, Sector-3A, IMT, Manesar, Gurugram, Haryana by M/s Maruti Suzuki India Limited.

Proposed expansion of existing Industrial shed for automobile manufacturing unit at Plot No.01, Sector-3A, IMT, Manesar, Gurugram, Haryana by M/s Maruti Suzuki India Limited is a proposed industrial building project in Baskusla, Gurgaon, Gurugram, Haryana. The site covers 537.7 acres. Its stated project cost is ₹15,772.9 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 9 Aug 2024).

See it on the live map All projects in Gurugram

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed expansion of existing Industrial shed for automobile manufacturing unit at Plot…

Project details

StatusCleared for impact study
Status since9 Aug 2024
Application filed5 Aug 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantMaruti Suzuki India Limited
UseIndustrial
Land area537.7 acres (217.6 ha)
Project cost₹15,772.9 crore
Village / localityBaskusla
Taluk / tehsilGurgaon
DistrictGurugram
StateHaryana
Location fromSite boundary on record
Our referenceWID-HR-00457

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 3 Sept 2024Environmental approval granted537.7 acres₹15,772.9 crore
Early planning filed 5 Aug 2024 (this page)Cleared for impact study537.7 acres₹15,772.9 crore

In context

747 applications in Gurugram since January 2022 are in the same category (Buildings & townships): 530 approved, 126 filed or under review, and 91 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 537.7 acres, this one is larger than 100% of them.

29 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Baskusla, Gurgaon, Gurugram, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Maruti Suzuki India Limited in Gurugram

3 Maruti Suzuki India projects in Gurgaon
All 11 Maruti Suzuki India projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.