One of 2 filings for this project. The project's main page, with every filing and where each stands: Boulder,Gravel and Sand Mining Project Jaidhari Block/YNR B 33 over an area of 48.60 Ha.
Project details
| Status | Lapsed |
|---|---|
| Status since | 26 Sept 2026 |
| Application filed | 19 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | Kulwinder Singh |
| Land area | 120.1 acres (48.6 ha) |
| Project cost | ₹9 crore |
| Village / locality | Jaidhari |
| Taluk / tehsil | Chhachhrauli |
| District | Yamunanagar |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00549 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 19 Jul 2024 (this page) | Lapsed | 120.1 acres | ₹9 crore |
| Early planning filed 11 Jan 2024 | Cleared for impact study | 120.1 acres | ₹9 crore |
In context
8 applications in Yamunanagar since January 2022 are in the same category (Mining): 6 approved, 0 filed or under review, and 2 withdrawn, lapsed or rejected.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Jaidhari, Chhachhrauli, Yamunanagar, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Boulder,Gravel and Sand Mining Project Jaidhari Block/YNR B 33 over an area of… — cleared for impact study, 0 m away
- Nala from Field of Sethi to Pond — lapsed, 2.2 km away
- Expansion of Capacity for Boulder,gravel and Sand Mining Project Malikpur… — cleared for impact study, 3.3 km away
- Diversion of forest land for access to the Proposed Retail Outlet of Reliance… — forest land use approved, 4.5 km away
- Retail out let of Reliance BP Mobility Limited at Vill Chuharpur Kalan distt… — lapsed, 5.8 km away
- Expansion of Formaldehyde manufacturing unit in existing Facility from 100 TPD… — returned to applicant, 6.4 km away
- Capacity Expansion in Formaldehyde Manufacturing Unit With the Existing… — lapsed, 6.4 km away
- Capacity Expansion in Formaldehyde Manufacturing Unit With the Existing… — returned to applicant, 6.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.