One of 2 filings for this project. The project's main page, with every filing and where each stands: Revision and Expansion of Research and Development Centre Project by M/s Innovative…
Project details
| Official title | Revision and Expansion of Research and Development Centre Project at Village – Badshahpur, Sector-75, Gurugram, Haryana by M/s Innovative Techno Park Pvt Ltd |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 4 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Innovative Techno Park Private Limited |
| Land area | 11.9 acres (4.8 ha) |
| Project cost | ₹350 crore |
| Village / locality | Badshahpur |
| Taluk / tehsil | Gurgaon |
| District | Gurugram |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00586 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 10 Apr 2024 | Environmental approval granted | 11.9 acres | ₹350 crore |
| Expansion filed 4 Mar 2024 (this page) | Lapsed | 11.9 acres | ₹350 crore |
In context
747 applications in Gurugram since January 2022 are in the same category (Buildings & townships): 530 approved, 126 filed or under review, and 91 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 11.9 acres, this one is larger than 55% of them.
161 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Badshahpur, Gurgaon, Gurugram, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Revision and Expansion of Research and Development Centre Project by M/s… — environmental approval granted, 0 m away
- Proposed Residential Group Housing Colony under TOD Policy by M/s Tulip… — environmental approval granted, 800 m away
- Proposed Residential Group Housing Colony under TOD Policy by M/s Tulip… — cleared for impact study, 800 m away
- Expansion of Group Housing "Vistas" — environmental approval granted, 850 m away
- Proposed Group Housing Colony Under TOD Policy-2016 over an area measuring… — environmental approval granted, 850 m away
- Proposed Group Housing Colony Under TOD Policy-2016 over an area measuring… — cleared for impact study, 850 m away
- Proposed project is construction of IT Park/Cyber Park project by M/s Radiance… — environmental approval granted, 850 m away
- Proposed project is construction of IT Park/Cyber Park project by M/s Radiance… — cleared for impact study, 850 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.