What is Developing? Open the mapMap

Cleared for impact studyIndustry · Jhajjar, Haryana

Expansion in Cement production capacity of Standalone Grinding Unit from EC granted capacity of 1.8 Million TPA to 5.5 Million TPA (Phase - I: 1.8 to 2.5 Million TPA through process optimization and de-bottlenecking in existing Cement Mill) & (Phase-II: 3.0 Million TPA by installation of additional Cement Mill)

Expansion in Cement production capacity of Standalone Grinding Unit from EC granted capacity of 1.8 Million TPA to 5.5 Million TPA (Phase - I: 1.8 to 2.5 Million TPA through process optimization and de-bottlenecking in existing Cement Mill) & (Phase-II: 3.0 Million TPA by installation of additional Cement Mill) is a proposed industrial project in Jharli, Matenhail, Jhajjar, Haryana. The site covers 113.6 acres. Its stated project cost is ₹853.3 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 17 Feb 2025).

See it on the live map All projects in Jhajjar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion in Cement production capacity of Standalone Grinding Unit from EC granted…

Project details

Official titleExpansion in Cement production capacity of Standalone Grinding Unit from EC granted capacity of 1.8 Million TPA to 5.5 Million TPA (Phase - I: 1.8 to 2.5 Million TPA through process optimization and de-bottlenecking in existing Cement Mill) & (Phase-II: 3.0 Million TPA by installation of additional Cement Mill) At Village: Jharli, Tehsil: Matenhail, District: Jhajjar, Haryana by M/s. UltraTech Cement Limited (Unit: Jhajjar Cement Works)
StatusCleared for impact study
Status since17 Feb 2025
Application filed1 Feb 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantUltraTech Cement Limited
Land area113.6 acres (46 ha)
Project cost₹853.3 crore
Village / localityJharli
Taluk / tehsilMatenhail
DistrictJhajjar
StateHaryana
Location fromSite boundary on record
Our referenceWID-HR-00776

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 14 Nov 2025Environmental approval granted113.6 acres₹853.3 crore
Early planning filed 1 Feb 2025 (this page)Cleared for impact study113.6 acres₹853.3 crore

In context

32 applications in Jhajjar since January 2022 are in the same category (Industry): 13 approved, 8 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 113.6 acres, this one is larger than 84% of them.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Jharli, Matenhail, Jhajjar, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 182 UltraTech Cement projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.