''Expansion of Grain Based Distillery Plant from 120 KLD to 250 KLD by M/s Nakshtra Biofuels Private Limited is a proposed industrial project in Budhanpur Sikri, Indri, Karnal, Haryana. The site covers 10.1 acres.
Who is building it?
The applicant is Nakshtra Biofuels Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Budhanpur Sikri, Indri, Karnal, Haryana.
How big is it?
It has a stated cost of ₹220 crore and a site of 10.1 acres.
When was it filed?
The application was filed on 10 Sept 2025.
Project details
| Official title | ''Expansion of Grain Based Distillery Plant from 120 KLD to 250 KLD along with CPP from 3.5 MW to 5 MW'' located at Village- Kadrabad, Tehsil- Indri, District- Karnal, Haryana by M/s Nakshtra Biofuels Private Limited |
|---|---|
| Status | Returned to applicant |
| Status since | 17 Apr 2026 |
| Application filed | 10 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Nakshtra Biofuels Private Limited |
| Land area | 10.1 acres (4.1 ha) |
| Project cost | ₹220 crore |
| Village / locality | Budhanpur Sikri |
| Taluk / tehsil | Indri |
| District | Karnal |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00793 |
In context
111 applications in Karnal since January 2022 are in the same category (Industry): 35 approved, 18 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 10.1 acres, this one is larger than 83% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Budhanpur Sikri, Indri, Karnal, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in capacity of grain based distillery unit from 120 KLD to 195 KLD… — cleared for impact study, 0 m away
- Fuel station by Manufacturing Unit of Ethanol of Nakshtra Biofuels Pvt. Ltd. — lapsed, 0 m away
- M/S New Era Realty ( Residential Plotted Colony -Private Property) — lapsed, 1.2 km away
- Shifting 11 KV Reach Ap Feeder Emanating From 132 KV Substation Indri Due to… — lapsed, 2.5 km away
- Shifting of 11 KV Reach Ap feeder from Herbal Park Indri — lapsed, 2.5 km away
- Diversion of forest land 0.0489Ha. for access to BPCL Retail Outlet within 6km… — more information requested, 2.9 km away
- Sewerage Pipeline — lapsed, 3.3 km away
- Xen Hsam Board Karnal — lapsed, 4.4 km away
More from Nakshtra Biofuels Private Limited in Karnal
- Expansion in capacity of grain based distillery unit from 120 KLD to 195 KLD… — cleared for impact study
- Fuel station by Manufacturing Unit of Ethanol of Nakshtra Biofuels Pvt. Ltd. — lapsed
All 3 Nakshtra Biofuels projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.