Expansion Grain Based Distillery Plant from 120 KLD to 200 KLD by M/s JVS Biofuel Pvt. Ltd is a proposed industrial project in Samru, Naraingarh, Ambala, Haryana. The site covers 14.9 acres. Its stated project cost is ₹110 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 31 Oct 2025).

See it on the live map All projects in Ambala

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion Grain Based Distillery Plant from 120 KLD to 200 KLD by M/s JVS Biofuel Pvt. Ltd is a proposed industrial project in Samru, Naraingarh, Ambala, Haryana. The site covers 14.9 acres.

Who is building it?

The applicant is Jvs Biofuels Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 31 Oct 2025), as of 27 Nov 2026.

Where is it?

In Samru, Naraingarh, Ambala, Haryana.

How big is it?

It has a stated cost of ₹110 crore and a site of 14.9 acres.

When was it filed?

The application was filed on 11 Sept 2025.

Project details

Official titleExpansion Grain Based Distillery Plant from 120 KLD to 200 KLD along with CPP of 4.0 MW by M/s JVS Biofuel Pvt. Ltd.
StatusCleared for impact study
Status since31 Oct 2025
Application filed11 Sept 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantJvs Biofuels Private Limited
Land area14.9 acres (6 ha)
Project cost₹110 crore
Village / localitySamru
Taluk / tehsilNaraingarh
DistrictAmbala
StateHaryana
Location fromSite boundary on record
Our referenceWID-HR-00812

In context

45 applications in Ambala since January 2022 are in the same category (Industry): 4 approved, 14 filed or under review, and 27 withdrawn, lapsed or rejected. At 14.9 acres, this one is larger than 79% of them.

25 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Samru, Naraingarh, Ambala, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jvs Biofuels Private Limited in Ambala

All 3 Jvs Biofuels projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.