Quick answers
What is this project?
Expansion Grain Based Distillery Plant from 120 KLD to 200 KLD by M/s JVS Biofuel Pvt. Ltd is a proposed industrial project in Samru, Naraingarh, Ambala, Haryana. The site covers 14.9 acres.
Who is building it?
The applicant is Jvs Biofuels Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 31 Oct 2025), as of 27 Nov 2026.
Where is it?
In Samru, Naraingarh, Ambala, Haryana.
How big is it?
It has a stated cost of ₹110 crore and a site of 14.9 acres.
When was it filed?
The application was filed on 11 Sept 2025.
Project details
| Official title | Expansion Grain Based Distillery Plant from 120 KLD to 200 KLD along with CPP of 4.0 MW by M/s JVS Biofuel Pvt. Ltd. |
|---|---|
| Status | Cleared for impact study |
| Status since | 31 Oct 2025 |
| Application filed | 11 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Jvs Biofuels Private Limited |
| Land area | 14.9 acres (6 ha) |
| Project cost | ₹110 crore |
| Village / locality | Samru |
| Taluk / tehsil | Naraingarh |
| District | Ambala |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00812 |
In context
45 applications in Ambala since January 2022 are in the same category (Industry): 4 approved, 14 filed or under review, and 27 withdrawn, lapsed or rejected. At 14.9 acres, this one is larger than 79% of them.
25 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Samru, Naraingarh, Ambala, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion Grain Based Distillery Plant from 120 KLD to 150 KLD by M/s JVS… — lapsed, 50 m away
- Expansion Grain Based Distillery Plant from 120 KLD to 200 KLD by M/s JVS… — returned to applicant, 200 m away
- River Bed mining Project "Rayawali-Sadhanpur",District Ambala — under environmental review, 200 m away
- River Bed mining Project "Rayawali-Sadhanpur",District Ambala — cleared for impact study, 200 m away
- River Bed mining Project "Rayawali-Sadhanpur",District Ambala — environmental approval granted, 200 m away
- River Bed mining Project "Rayawali-Sadhanpur",District Ambala — cleared for impact study, 200 m away
- Expansion by Addition of 180 KLD Grain based Ethanol Plant (under EBP) in… — environmental approval granted, 2.3 km away
- Expansion by Addition of 180 KLD Grain based Ethanol Plant (under EBP) in… — returned to applicant, 2.3 km away
More from Jvs Biofuels Private Limited in Ambala
- Expansion Grain Based Distillery Plant from 120 KLD to 200 KLD by M/s JVS… — returned to applicant
- Expansion Grain Based Distillery Plant from 120 KLD to 150 KLD by M/s JVS… — lapsed
All 3 Jvs Biofuels projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.