What is Developing? Open the mapMap

More information requestedBuildings & townships · Kurukshetra, Haryana

Industrial Unit/factory for manufacturing of Capital Goods, Metal forming Products/Fabricated equipment, Industrial Machinery/Equipments

Industrial Unit/factory for manufacturing of Capital Goods, Metal forming Products/Fabricated equipment, Industrial Machinery/Equipments is a proposed building project in Bartauli, Thanesar, Kurukshetra, Haryana. The site covers 49.1 acres. Its stated project cost is ₹7.6 crore. As of 27 Nov 2026, its status is “More information requested” (since 8 Nov 2026).

See it on the live map All projects in Kurukshetra

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Industrial Unit/factory for manufacturing of Capital Goods, Metal forming Products/Fabricated equipment, Industrial Machinery/Equipments is a proposed building project in Bartauli, Thanesar, Kurukshetra, Haryana. The site covers 49.1 acres.

Who is building it?

The applicant is Isgec Heavy Engineering Limited.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Bartauli, Thanesar, Kurukshetra, Haryana.

How big is it?

It has a stated cost of ₹7.6 crore and a site of 49.1 acres.

When was it filed?

The application was filed on 31 Aug 2026.

Project details

StatusMore information requested
Status since8 Nov 2026
Application filed31 Aug 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantIsgec Heavy Engineering Limited
Land area49.1 acres (19.9 ha)
Project cost₹7.6 crore
Village / localityBartauli
Taluk / tehsilThanesar
DistrictKurukshetra
StateHaryana
Location fromSite boundary on record
Our referenceWID-HR-00900

In context

39 applications in Kurukshetra since January 2022 are in the same category (Buildings & townships): 9 approved, 9 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 49.1 acres, this one is larger than 85% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bartauli, Thanesar, Kurukshetra, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Isgec Heavy Engineering Limited in Kurukshetra

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.