Quick answers
What is this project?
This lapsed industrial project by Servotech Renewable Power System Limited is in Kundli, Sonipat, Haryana. The site covers 0.7 acres.
Who is building it?
The applicant is Servotech Renewable Power System Limited.
Has it been approved?
No. The application was lapsed on 3 Apr 2026, so it is no longer under consideration.
Where is it?
In Kundli, Sonipat, Haryana.
How big is it?
It has a stated cost of ₹10.8 crore and a site of 0.7 acres.
When was it filed?
The application was filed on 10 Feb 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 3 Apr 2026 |
| Application filed | 10 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Servotech Renewable Power System Limited |
| Land area | 2,800 m² |
| Project cost | ₹10.8 crore |
| Village / locality | Kundli |
| Taluk / tehsil | Sonipat |
| District | Sonipat |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00966 |
In context
50 applications in Sonipat since January 2022 are in the same category (Industry): 14 approved, 7 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.7 acres, this one is smaller than 92% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kundli, Sonipat, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/S Design Promoters Private Limited (Private Property) Situated on Nangal… — lapsed, 350 m away
- Industrial Estate of HSIIDC at Sector 53-56, Kundli(Phase-V) — cleared for impact study, 1.9 km away
- Ushay Towers Project — withdrawn, 2.8 km away
- Ushay Towers Project — environmental approval granted, 2.8 km away
- Ushay Towers Project — withdrawn, 2.8 km away
- Ushay Towers Project — lapsed, 2.8 km away
- Environment Clearance for Development of Residential Group Housing Colony… — environmental approval granted, 3.2 km away
- Diversion of forest land for approach access to proposed site for setting up… — lapsed, 4.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.