What is Developing? Open the mapMap

Initial checksBuildings & townships · Karnal, Haryana

Expansion of Grain Based Distillery From 825 Klpd to 1050 Klpd by Enabling Usage of Mixture of Broken Rice & Maize, Modernization in Fermentation Technology and Change in Process Parameters to Achieve Higher Alcohol Production Within the Existing Plant Under "no Increase in Pollution Load" by Haryana Liquors PVT. LTD

Expansion of Grain Based Distillery From 825 Klpd to 1050 Klpd by Enabling Usage of Mixture of Broken Rice & Maize, Modernization in Fermentation Technology and Change in Process Parameters to Achieve Higher Alcohol Production Within the Existing Plant Under "no Increase in Pollution Load" by Haryana Liquors PVT. LTD is a proposed industrial building project in Jundla, Karnal, Haryana. The site covers 58.9 acres. Its stated project cost is ₹442.5 crore. As of 27 Nov 2026, its status is “Initial checks” (since 29 Sept 2026).

See it on the live map All projects in Karnal

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Grain Based Distillery From 825 Klpd to 1050 Klpd by Enabling Usage of Mixture of Broken Rice & Maize, Modernization in Fermentation Technology and Change in Process Parameters to Achieve Higher Alcohol Production Within the Existing Plant Under "no Increase in Pollution Load" by Haryana Liquors PVT. LTD is a proposed industrial building project in Jundla, Karnal, Haryana. The site covers 58.9 acres.

Who is building it?

The applicant is Haryana Liquors Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Jundla, Karnal, Haryana.

How big is it?

It has a stated cost of ₹442.5 crore and a site of 58.9 acres.

When was it filed?

The application was filed on 29 Sept 2026.

Project details

Official titleExpansion of Grain Based Distillery From 825 Klpd to 1050 Klpd by Enabling Usage of Mixture of Broken Rice & Maize, Modernization in Fermentation Technology and Change in Process Parameters to Achieve Higher Alcohol Production Within the Existing Plant Under "no Increase in Pollution Load" by Haryana Liquors PVT. LTD. at Village Jundla, Tehsil Karnal, District Karnal, Haryana.
StatusInitial checks
Status since29 Sept 2026
Application filed29 Sept 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantHaryana Liquors Private Limited
UseIndustrial
Land area58.9 acres (23.8 ha)
Project cost₹442.5 crore
Village / localityJundla
Taluk / tehsilKarnal
DistrictKarnal
StateHaryana
Location fromSite boundary on record
Our referenceWID-HR-01052

In context

86 applications in Karnal since January 2022 are in the same category (Buildings & townships): 26 approved, 17 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 58.9 acres, this one is larger than 92% of them.

30 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Jundla, Karnal, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Haryana Liquors projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.