Quick answers
What is this project?
Diversion of Forest Land of 2.1442ha. for Widening With Hard Shouldering and Strengthening of Road G.T Road to Babain (Id 7948) at Ladwa Constituency is a proposed road project in Babain, Shahbad, Kurukshetra, Haryana. The site covers 5.3 acres.
Who is building it?
The applicant is PWD (B&R) Kurukshetra.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Babain, Shahbad, Kurukshetra, Haryana.
How big is it?
It has a stated cost of ₹15 crore; a site of 5.3 acres and 5.3 acres (2.1 ha) of forest land.
When was it filed?
The application was filed on 15 Oct 2026.
Project details
| Official title | Diversion of Forest Land of 2.1442ha. for Widening With Hard Shouldering and Strengthening of Road G.T Road to Babain (Id 7948) at Ladwa Constituency in District Kurukshetra (Hr). |
|---|---|
| Status | More information requested |
| Status since | 28 Oct 2026 |
| Application filed | 15 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | PWD (B&R) Kurukshetra |
| Land area | 5.3 acres (2.1 ha) |
| Forest land | 5.3 acres (2.1 ha) |
| Project cost | ₹15 crore |
| Village / locality | Babain |
| Taluk / tehsil | Shahbad |
| District | Kurukshetra |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-01512 |
In context
16 applications in Kurukshetra since January 2022 are in the same category (Roads & highways): 2 approved, 7 filed or under review, and 7 withdrawn, lapsed or rejected. At 5.3 acres, this one is smaller than 56% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Babain, Shahbad, Kurukshetra, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land of 0.0115 Ha. for access to Plotted Colony (Jaggi… — lapsed, 400 m away
- Creation of 66kV S/C line on D/C towers from 66kV S/stn. Lohara to 66kV S/stn.… — initial checks, 1.3 km away
- Diversion of forest land of 0.7764Ha. for construction of 4 - lanning GT. road… — under forest review, 2.3 km away
- Transport Office of Sh. Amarjeet Singh — lapsed, 3.8 km away
- Manufacturing of PVC Pipes belonging to Sh. Hitesh Jain S/o Sh. Purushotam Lal… — lapsed, 3.8 km away
- Industrial project by Hanchett Hardware Systems Private Limited — lapsed, 4.3 km away
- IOCL Retail Outlet — forest land use approved, 4.7 km away
- Providing Sewerage Network and Construction of Sewage Treatment Plant — lapsed, 4.7 km away
More from PWD (B&R) Kurukshetra in Kurukshetra
- Diversion of forest land of 2.4450Ha. for Construction of widening and… — lapsed
- Diversion of Forest Land of 0.5520ha. for Widening With Hard Shouldering and… — more information requested
- Diversion of forest land of 0.9187 Ha. for construction of 4 - lanning GT.… — more information requested
- Diversion of forest land of 0.7764Ha. for construction of 4 - lanning GT. road… — under forest review
- Re-Diversion of Forest Land of 0.87ha. for Improvement of Saharanpur -… — lapsed