Quick answers
What is this project?
New Roundabout at Ambli Junction on Bilaspur Sadhaura Naraingarh road SH-01 in distt Ambala is a lapsed road project in Amli, Naraingarh, Ambala, Haryana. The site covers 0.1 acres.
Who is building it?
The applicant is Public Works Deptt Haryana Shahzadpur.
Has it been approved?
No. The application was lapsed on 17 Jun 2026, so it is no longer under consideration.
Where is it?
In Amli, Naraingarh, Ambala, Haryana.
How big is it?
It has a stated cost of ₹82 lakh; a site of 0.1 acres and 500 m² of forest land.
When was it filed?
The application was filed on 12 May 2026.
Project details
| Official title | construction of New Roundabout at Ambli Junction on Bilaspur Sadhaura Naraingarh road SH-01 in distt Ambala |
|---|---|
| Status | Lapsed |
| Status since | 17 Jun 2026 |
| Application filed | 12 May 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Public Works Deptt Haryana Shahzadpur |
| Land area | 500 m² |
| Forest land | 500 m² |
| Project cost | ₹82 lakh |
| Village / locality | Amli |
| Taluk / tehsil | Naraingarh |
| District | Ambala |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-01552 |
In context
30 applications in Ambala since January 2022 are in the same category (Roads & highways): 6 approved, 6 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0.1 acres, this one is smaller than 86% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amli, Naraingarh, Ambala, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Roundabout at Ambli Junction road SH-01 — more information requested, 0 m away
- Aara Mill & Dharm kanta belonging to Sh. Hanif Ali S/o Sh. Rahamdeen — lapsed, 2.7 km away
- Mining of Sand (Minor Mineral) from the Riverbed of Markanda River in… — under environmental review, 3.1 km away
- Mining of Sand (Minor Mineral) from the Riverbed of Markanda River in… — environmental approval granted, 3.1 km away
- Mining of Sand (Minor Mineral) from the Riverbed of Markanda River in… — cleared for impact study, 3.1 km away
- Industrial project by Greybox Eco Prodcuts Pvt Ltd — lapsed, 3.8 km away
- Creation of 66KV D/C Line From Proposed 220KV Sub Station Sadhaura to 66KV Sub… — forest land use approved, 3.8 km away
- Creation of 66KV D/C Line From Proposed 220KV Sub Station Sadhaura to 66KV Sub… — forest land use approved, 3.8 km away
More from Public Works Deptt Haryana Shahzadpur in Ambala
- Diversion of 1.508 Ha of Forest Land for construction of H.L. bridge over… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.