Quick answers
What is this project?
IGL CNG Gas Pipeline starting from Mayapuri colony on Kaithal-Karnal road to Village Geong Total Length 5000 mtr is a proposed pipeline project in Geong, Kaithal, Haryana. The site covers 0.6 acres.
Who is building it?
The applicant is Indraprastha Gas Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Geong, Kaithal, Haryana.
How big is it?
It has a stated cost of ₹1.5 crore; a site of 0.6 acres and 2,500 m² of forest land.
When was it filed?
The application was filed on 8 Sept 2024.
Project details
| Status | More information requested |
|---|---|
| Status since | 9 Mar 2026 |
| Application filed | 8 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Indraprastha Gas Limited |
| Land area | 2,500 m² |
| Forest land | 2,500 m² |
| Project cost | ₹1.5 crore |
| Village / locality | Geong |
| Taluk / tehsil | Kaithal |
| District | Kaithal |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-01618 |
In context
20 applications in Kaithal since January 2022 are in the same category (Pipelines): 2 approved, 12 filed or under review, and 6 withdrawn, lapsed or rejected. At 0.6 acres, this one is larger than 50% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Geong, Kaithal, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.004065 Ha. of Forest Land for Educational Institute (Senior… — forest land use approved, 1000 m away
- Proposed New Distillery of 120 Kld Capacity Consisting of B-Heavy Molasses… — environmental approval granted, 1.2 km away
- Proposed New Distillery of 120 Kld Capacity Consisting of B-Heavy Molasses… — returned to applicant, 1.2 km away
- Proposed New Distillery of 120 Kld Capacity Consisting of B-Heavy Molasses… — cleared for impact study, 1.2 km away
- Diversion of Forest Land of 0.0075Ha. for access to Hospital of M/s Aarsh… — lapsed, 1.3 km away
- Diversion of 0.1000 Ha. of Forest Land for laying of IGL GAS PIPE LINE 2000… — lapsed, 1.8 km away
- Laying of Underground Ofc by Telesonic Networks Limited (Airtel). Tota Lenght… — lapsed, 2.4 km away
- Diversion of 0.1125 Ha. of Forest Land for laying of IGL GAS PIPE LINE (2250… — more information requested, 3.1 km away
More from Indraprastha Gas Limited in Kaithal
- Diversion of 0.3250 Ha. of Forest Land Proposed Igl Gas Pipe Line (6500 Mt @ ø… — more information requested
- Diversion of 0.4500 Ha. of Forest Land Proposed Igl Gas Pipe Line (9000 Mt @ ø… — more information requested
- Diversion of 0.7300 Ha. of Forest Land Proposed Igl Gas Pipe Line (14600 Mt @… — more information requested
- Diversion of 0.065 Ha. of Forest Land for laying of IGL GAS PIPE LINE (1300 MT… — more information requested
- Diversion of 0.1300 Ha. of Forest Land Proposed Igl Gas Pipe Line (2600 Mt @ ø… — more information requested
- Diversion of 0.095 Ha. of Forest Land for laying of IGL GAS PIPE LINE (1900 MT… — more information requested
18 Indraprastha Gas projects in Kaithal
All 84 Indraprastha Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.