Quick answers
What is this project?
Diversion of Forest Land for Access to Approach Road From the Proposed Site for Hotel With Banquet Facility is a lapsed building project in Sultanpur, Panchkula, Haryana. The site covers 1.1 acres.
Who is building it?
The applicant is Amrit Chopra.
Has it been approved?
No. The application was lapsed on 3 Apr 2024, so it is no longer under consideration.
Where is it?
In Sultanpur, Panchkula, Haryana.
How big is it?
It has a stated cost of ₹2 crore; a site of 1.1 acres and 750 m² of forest land.
When was it filed?
The application was filed on 11 Nov 2023.
Project details
| Official title | Diversion of Forest Land for Access to Approach Road From the Proposed Site for Hotel With Banquet Facility in the Revenue Estate of Village – Sultanpur, Tehsil – Barwala, Distt. – Panchkula (Hr) |
|---|---|
| Status | Lapsed |
| Status since | 3 Apr 2024 |
| Application filed | 11 Nov 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Amrit Chopra |
| Land area | 1.1 acres (0.4 ha) |
| Forest land | 750 m² |
| Project cost | ₹2 crore |
| Village / locality | Sultanpur |
| Taluk / tehsil | Panchkula |
| District | Panchkula |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-01698 |
In context
64 applications in Panchkula since January 2022 are in the same category (Buildings & townships): 18 approved, 10 filed or under review, and 36 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.1 acres, this one is smaller than 73% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sultanpur, Panchkula, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Extension of EC validity for Sand (Minor Mineral) Mining Project of Naggal… — more information requested, 1.7 km away
- Diversion of Forest Land of 0.0173Ha. for access to Affordable Residental… — lapsed, 2.1 km away
- Rediversion of Forest Land of 0.0173Ha. for access to Affordable Residental… — under forest review, 2.1 km away
- Diversion of 0.02517 Ha. of Forest Land in Favour of M/S Refuellers for Access… — lapsed, 2.1 km away
- Proposed Formaldehyde, Melamine Formaldehyde Resin and Cardanol Phenol… — environmental approval granted, 3.1 km away
- City Gas Distribution Project — more information requested, 3.4 km away
- Diversion of forest Land for approach access to proposed site for setting up… — lapsed, 4.2 km away
- Diversion of 1.3667 Ha. Forest Land for the widening and strengthening of… — lapsed, 4.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.