What is Developing? Open the mapMap

Forest land use approvedPower · Ambala, Haryana

Creation of 220kV D/C line from 400kv S/Stn PGCIL Nagal Panchkula to proposed 200kV S/Stn Sadhaura with 0.5 SQ" moose conductor

Creation of 220kV D/C line from 400kv S/Stn PGCIL Nagal Panchkula to proposed 200kV S/Stn Sadhaura with 0.5 SQ" moose conductor is an approved power project in Gadauli, Naraingarh, Ambala, Haryana. The site covers 313.2 acres. Its stated project cost is ₹29.8 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 6 Nov 2025).

See it on the live map All projects in Ambala

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Creation of 220kV D/C line from 400kv S/Stn PGCIL Nagal Panchkula to proposed 200kV S/Stn Sadhaura with 0.5 SQ" moose conductor is an approved power project in Gadauli, Naraingarh, Ambala, Haryana. The site covers 313.2 acres.

Who is building it?

The applicant is Executive Engineer.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 6 Nov 2025), as of 27 Nov 2026.

Where is it?

In Gadauli, Naraingarh, Ambala, Haryana.

How big is it?

It has a stated cost of ₹29.8 crore; a site of 313.2 acres and 910 m² of forest land.

When was it filed?

The application was filed on 4 Apr 2024.

Project details

StatusForest land use approved
Status since6 Nov 2025
Application filed4 Apr 2024
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantExecutive Engineer
Land area313.2 acres (126.8 ha)
Forest land910 m²
Project cost₹29.8 crore
Village / localityGadauli
Taluk / tehsilNaraingarh
DistrictAmbala
StateHaryana
Location fromSite area on record
Our referenceWID-HR-01858

In context

8 applications in Ambala since January 2022 are in the same category (Power): 6 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Gadauli, Naraingarh, Ambala, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Executive Engineer in Ambala

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.