Quick answers
What is this project?
Gate Structure on LMB Markanda on Band in Ghallery Distt Ambala is a lapsed project in Gelari, Barara, Ambala, Haryana. The site covers 0.1 acres.
Who is building it?
The applicant is Darbara Singh.
Has it been approved?
No. The application was lapsed on 27 Nov 2023, so it is no longer under consideration.
Where is it?
In Gelari, Barara, Ambala, Haryana.
How big is it?
It has a stated cost of ₹34 lakh; a site of 0.1 acres and 150 m² of forest land.
When was it filed?
The application was filed on 22 Jun 2023.
Project details
| Official title | Construction of Gate Structure on LMB Markanda on Band in Ghallery Distt Ambala |
|---|---|
| Status | Lapsed |
| Status since | 27 Nov 2023 |
| Application filed | 22 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Darbara Singh |
| Land area | 300 m² |
| Forest land | 150 m² |
| Project cost | ₹34 lakh |
| Village / locality | Gelari |
| Taluk / tehsil | Barara |
| District | Ambala |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-01963 |
In context
52 applications in Ambala since January 2022 are in the same category (Other): 3 approved, 12 filed or under review, and 37 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 96% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gelari, Barara, Ambala, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gate Structure on Lmb Markanda & Drain for the Protection Abadi & Agriculture… — forest land use approved, 50 m away
- Industrial project by NU-ech Agri Machines Private Limited — lapsed, 3.1 km away
- Sh. Raj Kumar S/o Sh. Gurnam Singh — initial checks, 3.1 km away
- Diversion of forest land for Laying of underground 4-Inch HPOIL GAS Pipeline… — lapsed, 3.9 km away
- Shree Bala ji Vaishno Dhaba — lapsed, 5 km away
- Kuljeet Kochhar — lapsed, 5.2 km away
- Diversion of forest Land for approach access to proposed site for setting up… — initial checks, 5.5 km away
- Drain and Laying Ipbs. M-40 Along Road From Railway Stn to Stp in Mc Barara… — lapsed, 5.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.