What is Developing? Open the mapMap

LapsedBuildings & townships · Sirsa, Haryana

Access to proposed Weigh Bridge to be install by Sh. Krishan Kumar S/o Sh. Mani Ram

Access to proposed Weigh Bridge to be install by Sh. Krishan Kumar S/o Sh. Mani Ram is a lapsed building project in Darba Kalan, Nathusari Chopta, Sirsa, Haryana. The site covers 0.4 acres. Its stated project cost is ₹50 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 21 Sept 2025).

See it on the live map All projects in Sirsa

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Access to proposed Weigh Bridge to be install by Sh. Krishan Kumar S/o Sh. Mani Ram is a lapsed building project in Darba Kalan, Nathusari Chopta, Sirsa, Haryana. The site covers 0.4 acres.

Who is building it?

The applicant is Krishan Kumar Weigh Bridge.

Has it been approved?

No. The application was lapsed on 21 Sept 2025, so it is no longer under consideration.

Where is it?

In Darba Kalan, Nathusari Chopta, Sirsa, Haryana.

How big is it?

It has a stated cost of ₹50 lakh; a site of 0.4 acres and 130 m² of forest land.

When was it filed?

The application was filed on 20 Aug 2025.

Project details

Official titleAccess to proposed Weigh Bridge to be install by Sh. Krishan Kumar S/o Sh. Mani Ram at Village Darba Kalan on Sirsa Ludesar Bhadra Road MDR No.104 R.H.S. Km.18-19 in Sirsa Distt.
StatusLapsed
Status since21 Sept 2025
Application filed20 Aug 2025
Approval soughtForest land use
Application typeNew project
SectorBuildings & townships
ApplicantKrishan Kumar Weigh Bridge
Land area1,800 m²
Forest land130 m²
Project cost₹50 lakh
Village / localityDarba Kalan
Taluk / tehsilNathusari Chopta
DistrictSirsa
StateHaryana
Location fromSite boundary on record
Our referenceWID-HR-02013

In context

80 applications in Sirsa since January 2022 are in the same category (Buildings & townships): 17 approved, 14 filed or under review, and 49 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.4 acres, this one is smaller than 86% of them.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Darba Kalan, Nathusari Chopta, Sirsa, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.