What is Developing? Open the mapMap

Forest land use approvedIndustry · Sonipat, Haryana

Diversion of forest land for proposed site for setting up Industrial Unit (Manufacturing Unit for Plastic Bottles)

Diversion of forest land for proposed site for setting up Industrial Unit (Manufacturing Unit for Plastic Bottles) is an approved industrial project in Jakhauli, Sonipat, Haryana. The site covers 1.2 acres. Its stated project cost is ₹1 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 21 Jul 2025).

See it on the live map All projects in Sonipat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of forest land for proposed site for setting up Industrial Unit (Manufacturing Unit for Plastic Bottles) is an approved industrial project in Jakhauli, Sonipat, Haryana. The site covers 1.2 acres.

Who is building it?

The applicant is Sanjay Singhal.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 21 Jul 2025), as of 27 Nov 2026.

Where is it?

In Jakhauli, Sonipat, Haryana.

How big is it?

It has a stated cost of ₹1 crore; a site of 1.2 acres and 80 m² of forest land.

When was it filed?

The application was filed on 20 Jan 2025.

Project details

Official titleDiversion of forest land for proposed site for setting up Industrial Unit (Manufacturing Unit for Plastic Bottles) in the Revenue Estate of Village - Jakhauli, Tehsil - Rai, District - Sonipat (HR)
StatusForest land use approved
Status since21 Jul 2025
Application filed20 Jan 2025
Approval soughtForest land use
Application typeNew project
SectorIndustry
ApplicantSanjay Singhal
Land area1.2 acres (0.5 ha)
Forest land80 m²
Project cost₹1 crore
Village / localityJakhauli
Taluk / tehsilSonipat
DistrictSonipat
StateHaryana
Location fromSite boundary on record
Our referenceWID-HR-02082

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 20 Jan 2025 (this page)Forest land use approved1.2 acres₹1 crore
New project filed 3 Aug 2024Lapsed1.2 acres₹1 crore

In context

50 applications in Sonipat since January 2022 are in the same category (Industry): 14 approved, 7 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.2 acres, this one is smaller than 80% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Jakhauli, Sonipat, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.